Laserfiche WebLink
1 , <br /> ARCO Products Company 5 <br /> ARCO 4932 16 E Harding Way,Stockton CA November 6 2600 <br />' r • Interim remediation/feasibility testing, consisting of a 5-day dual phase <br /> extraction remedial program should be conducted <br /> • Additional site assessment to define the lateral and vertical extent of <br /> hydrocarbons in soil and groundwater <br />' • Performance of a 500-foot radius door-to-door well survey to verify the absence <br /> of sensitive receptors in the immediate area of the site <br />' If you have any questions or comments regarding this report, please feel free to call us at <br /> (916) 861-0400 <br /> Sincerely, <br /> SECOR International Incorporated <br /> EDi <br /> Rusty enkosky, P o� <br /> Project Manager pqp�AY '� <br /> ' <br /> A�' <br /> (PNa6260 <br /> 'e" <br /> Greg Barclay, R G 6260 <br /> Technical Coordinator <br /> ' Attachments Table 1 - Soil Analytical Data - Soil Borings <br /> Table 2 - Groundwater Elevation and Analytical Data <br /> Table 3 - Well Survey Data <br /> Table 4 - Soil Analytical Data - Stockpiled Soil <br /> Figure 1 - Site Location Map <br /> Figure 2 - Groundwater Chemical Results Map <br /> Figure 3 - Groundwater Elevation Contour Map <br /> Figure 4 - 1/2 Mile Radius Well Survey <br /> Attachment A - SJCPHS Letter, dated March 31, 2000 <br /> Attachment B - Boring Logs <br /> ' Attachment C - Field and Laboratory Procedures <br /> Attachment D - Certified Analytical Reports and Chain-of-Custody <br /> Documentation <br /> Attachment E - Groundwater Sampling Field Sheets <br /> ' Attachment F - Survey Data <br /> cc Mr Paul Supple, Atlantic Richfield Company <br /> Mr Marty Hartzell, RWQCB <br /> 1 <br /> ' 077 41983 330/well install <br />