My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
12101
>
2200 - Hazardous Waste Program
>
PR0505950
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2019 11:50:41 AM
Creation date
11/6/2018 8:37:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505950
PE
2229
FACILITY_ID
FA0004407
FACILITY_NAME
STAR BUILDING SYSTEMS
STREET_NUMBER
12101
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
05132007
CURRENT_STATUS
02
SITE_LOCATION
12101 E BRANDT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\B\BRANDT\12101\PR0505950\COMPLIANCE INFO\COMPLIANCE INFO PRE 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOCATION <br /> Site-Wide <br /> REQUIREMENTS <br /> A. General <br /> Prevent or reduce the discharge of pollutants to storm water from building repair, <br /> remodeling, and construction by using soil erosion controls, enclosing or covering <br /> building material storage areas, covering and/or diking storm drain catch basins, using <br /> good housekeeping practices, using safer alternative products, and training employees. <br /> 1.Each job site should be managed in such a manner to avoid discharges of <br /> prohibited substances to the storm drain system. <br /> 2.Routine inspection of job site should be performed to ensure that construction„ <br /> demolition, and excavation materials (liquid or solid) are not entering the storm <br /> drain system. <br /> 3.Keep the job site tidy and clean up debris regularly. <br /> 4.Stor7n drain catch basins should be covered to prevent pollutants and sediments <br /> from entering the storm drain system. <br /> 5.Special precautions should be employed if rain is forecast or if water is applied. <br /> B. Good Housekeeping <br /> Proper care involves a variety of mostly common sense, housekeeping actions such as: <br /> 1.Keep the work site clean and orderly. Removing debris in a timely fashion. <br /> Sweep the area. <br /> 2.Cover materials of particular concern such as hazardous materials or sand piles <br /> that must remain outdoors, particularly during the rainy season. <br /> 3.Educate employees who are doing the work. <br /> 4.Inform on-site contractors of Robertson-Ceco Corp. policy. Include appropriate <br /> provisions in their contract to make certain proper housekeeping and disposal practices <br /> are implemented. <br /> 5.Make sure that nearby storm drains are well marked to minimize the chance of <br /> inadvertent disposal of residual paints and other liquids. <br /> 6.Do not dump waste liquids down the storm drain. <br /> 7.Advise concrete truck drivers to not wash their truck over the storm drain. <br /> 8.Cleaning equipment or tools over catch basins is prohibited. <br /> C.Painting <br /> 1.Painting operations should be properly enclosed or covered to avoid drift. <br /> 2.Use temporary scaffolding to hang drop cloths or draperies to prevent drift. Use <br /> application equipment that minimizes overspray. <br />
The URL can be used to link to this page
Your browser does not support the video tag.