Laserfiche WebLink
Advanced Interconnect Technologies <br />Source Reduction Plan <br />Page 9 <br />6.1.1.2.2. Technical Feasibility. <br />6.1.1.2.3. Economic Evaluation. <br />6.1.1.2.4. Effect on Product Quality. <br />6.1.1.2.5. Employee health and Safety Implications. <br />6.1.1.2.6. Applicable State and Local Permits <br />6.1.1.2.7. Releases and Discharges. <br />6.1.1.3. Selection and Analysis of Source Reduction Measures. <br />6.1.1.3.1. The measures from each waste stream were analyzed <br />and selected in order of their calculated weight value <br />with the highest weight value given the highest priority of <br />implementation, if feasible. If no measures were <br />identified for a certain approach, then the weight for that <br />approach was given a zero. Evaluation criteria were <br />weighted 1 to 7 in order of importance and measures <br />were weighted in relation to one another with a higher <br />number indicating a greater effectiveness in regards to <br />the evaluation criteria being considered. <br />6.1.1.3.2. Spent Lead Filters — (CWC 352) Table 2. contains a <br />summary of the measures considered. <br />Site Name: Advanced Interconnect Technologies <br />Reporting Year: 1998 I. Change in II. Technical III. Economic IV. Effects on V. Employee H8 VI. State 8 Local VII. Release <br />CWC: 491 (Spent Lead Filters) Haz. Waste Feasibility Evaluation Producl Quality Implications Law Compliance Discharges <br />Approaches <br />Measures <br />V� <br />R <br />5 <br />RXW <br />W= <br />R <br />2 <br />RXW <br />W= <br />R <br />1 <br />RXW <br />W= <br />R <br />3 <br />RXW <br />W= <br />R <br />] <br />RXW <br />W= <br />R <br />6 <br />RXW <br />W= <br />R <br />4 <br />RXW <br />TOTAL <br />Sum <br />(RXW) <br />Input <br />Lead Conn. <br />1 <br />5 <br />1 <br />2 <br />1 <br />1 <br />1 <br />3 <br />1 <br />] <br />1 <br />6 <br />1 <br />4 <br />28 <br />Changes <br />below 0.40ppm <br />Operational <br />None Identified <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Improvement <br />Production <br />None Identified <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Process <br />Changes <br />Phil <br />None Identified <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />a <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Reformulations <br />Atlminiatralive <br />None Itlent d <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Steps <br />6.1.1.3.2.1. Input Change Measure —Reduce lead <br />concentration of anodizing solution below <br />