09/08/2000 12:40 7075701lF1 AGE -SR - PAGE. 01/01
<br />Advanced GeoEnvironmental, Inc. 1 �,, 1996
<br />4005 North Wilson Way Dat: 09/08 Date nagvi.d. 09/08
<br />Stockton, CA 95205 Proposal valid for 60 days
<br />Ph: 209.467-1006
<br />Fac 209467.1118
<br />'If adddicml Ilma/metrWelBJCcgnlnlct ",.. we requlfed to c A plate the amps a work the MBI Invoice wtll be a4�e,d aowNingly.
<br />RV Circuits
<br />Mr. John
<br />Hinkel
<br />11122
<br />East Comstock Road
<br />916
<br />South Center
<br />Street
<br />Stockton,
<br />CA 95215
<br />Stockton,
<br />CA
<br />Ph:
<br />Fax
<br />ampe:
<br />Preliminary Sndangeratent AbaCMQUnt
<br />1 IIPLANNING
<br />& PERM1IITT[NG
<br />Health & Safety Plan, MEGA - C11-1
<br />WV
<br />1.0
<br />$2,650.00
<br />52,650,00
<br />pgnpj; p-pd{p
<br />n
<br />2.0
<br />$100.00
<br />5200.00
<br />Permit Preperabora Staff Geologist
<br />hn
<br />1.0
<br />S65.00
<br />$65.00
<br />Utility Clearance, Txhnicim
<br />A
<br />1.0
<br />$45.00
<br />$45.00
<br />Pre -Field Fleming and Coordination, Project Gmlo&t
<br />tree
<br />4.0
<br />$75.00
<br />$300.00
<br />Regulatory Liaison, Project Geologist
<br />n.,
<br />4.0
<br />$75.00
<br />$300.00
<br />2
<br />PROBING AND SANIPLING
<br />Probing S races, EuW0PrQbe
<br />an
<br />2.0
<br />51,200.00
<br />$2,400.00
<br />Mob / Demob
<br />a
<br />1.0
<br />$200.00
<br />$200.00
<br />Staff Geologist
<br />w
<br />20.0
<br />565.00
<br />$1,300.00
<br />PID/OVM
<br />d.,
<br />2.0
<br />$100.00
<br />$200.00
<br />Misc. Field Supplies
<br />CA
<br />1.0
<br />$150.00
<br />$150.00
<br />Health 8: Safety Equipment / Supplies
<br />a.y.
<br />2.0
<br />$100.00
<br />$200.00
<br />Couctete Cutting
<br />a,b
<br />1.0
<br />5395-00
<br />S395.00
<br />3
<br />LABORATORY ANALYSIS
<br />Soil Samples:
<br />pN, EPA 9045
<br />w
<br />25.0
<br />515.00
<br />5775,00
<br />Total lead, cobalt, copper, chromium, zinc; EPA 6010
<br />Ce
<br />25.0
<br />$70.00
<br />$1,750.00
<br />Total cyanide, EPA 335.2
<br />ea
<br />25.0
<br />$84.00
<br />$2,100.00
<br />Soluble ciuomium, zinc, copper, nickel, cobalt; various methods
<br />..
<br />10.0
<br />$130.00
<br />$1,300.00
<br />Ground Water Samples:
<br />pH, EPA 150.1
<br />u
<br />2.0
<br />$15.00
<br />$30.00
<br />Total chromium, copper, nickel, zinc; EPA 200-7
<br />e.
<br />2.0
<br />$55.00
<br />$110.00
<br />Lead, EPA 200.9
<br />AA
<br />2.0
<br />$15.00
<br />$30.00
<br />Total cyanide, EPA 335.2
<br />..
<br />2.0
<br />$84.00
<br />5168.00
<br />HVOC's, EPA 8010
<br />AA
<br />2.0
<br />$80.00
<br />$160.00
<br />4
<br />REPORT PREPARATION
<br />Project Geologist
<br />M
<br />16.0
<br />$75.00
<br />$1,200.00
<br />Staff Geologist
<br />hr
<br />8.0
<br />$65.00
<br />$520.00
<br />Senior Geologist
<br />h,
<br />8.0
<br />$105.00
<br />$840.00
<br />Draftsman
<br />h<
<br />5.0
<br />$45.00
<br />$225.00
<br />Clerical
<br />2.0
<br />$35.00
<br />$70.00
<br />Total Amount511283.00
<br />Tax nate Tax
<br />$17 283.00
<br />Total Estimated Cool
<br />Meeee e
<br />Name: REM
<br />Dam: 09/08/2000
<br />T::
<br />Signature:
<br />'If adddicml Ilma/metrWelBJCcgnlnlct ",.. we requlfed to c A plate the amps a work the MBI Invoice wtll be a4�e,d aowNingly.
<br />
|