Laserfiche WebLink
09/08/2000 12:40 7075701lF1 AGE -SR - PAGE. 01/01 <br />Advanced GeoEnvironmental, Inc. 1 �,, 1996 <br />4005 North Wilson Way Dat: 09/08 Date nagvi.d. 09/08 <br />Stockton, CA 95205 Proposal valid for 60 days <br />Ph: 209.467-1006 <br />Fac 209467.1118 <br />'If adddicml Ilma/metrWelBJCcgnlnlct ",.. we requlfed to c A plate the amps a work the MBI Invoice wtll be a4�e,d aowNingly. <br />RV Circuits <br />Mr. John <br />Hinkel <br />11122 <br />East Comstock Road <br />916 <br />South Center <br />Street <br />Stockton, <br />CA 95215 <br />Stockton, <br />CA <br />Ph: <br />Fax <br />ampe: <br />Preliminary Sndangeratent AbaCMQUnt <br />1 IIPLANNING <br />& PERM1IITT[NG <br />Health & Safety Plan, MEGA - C11-1 <br />WV <br />1.0 <br />$2,650.00 <br />52,650,00 <br />pgnpj; p-pd{p <br />n <br />2.0 <br />$100.00 <br />5200.00 <br />Permit Preperabora Staff Geologist <br />hn <br />1.0 <br />S65.00 <br />$65.00 <br />Utility Clearance, Txhnicim <br />A <br />1.0 <br />$45.00 <br />$45.00 <br />Pre -Field Fleming and Coordination, Project Gmlo&t <br />tree <br />4.0 <br />$75.00 <br />$300.00 <br />Regulatory Liaison, Project Geologist <br />n., <br />4.0 <br />$75.00 <br />$300.00 <br />2 <br />PROBING AND SANIPLING <br />Probing S races, EuW0PrQbe <br />an <br />2.0 <br />51,200.00 <br />$2,400.00 <br />Mob / Demob <br />a <br />1.0 <br />$200.00 <br />$200.00 <br />Staff Geologist <br />w <br />20.0 <br />565.00 <br />$1,300.00 <br />PID/OVM <br />d., <br />2.0 <br />$100.00 <br />$200.00 <br />Misc. Field Supplies <br />CA <br />1.0 <br />$150.00 <br />$150.00 <br />Health 8: Safety Equipment / Supplies <br />a.y. <br />2.0 <br />$100.00 <br />$200.00 <br />Couctete Cutting <br />a,b <br />1.0 <br />5395-00 <br />S395.00 <br />3 <br />LABORATORY ANALYSIS <br />Soil Samples: <br />pN, EPA 9045 <br />w <br />25.0 <br />515.00 <br />5775,00 <br />Total lead, cobalt, copper, chromium, zinc; EPA 6010 <br />Ce <br />25.0 <br />$70.00 <br />$1,750.00 <br />Total cyanide, EPA 335.2 <br />ea <br />25.0 <br />$84.00 <br />$2,100.00 <br />Soluble ciuomium, zinc, copper, nickel, cobalt; various methods <br />.. <br />10.0 <br />$130.00 <br />$1,300.00 <br />Ground Water Samples: <br />pH, EPA 150.1 <br />u <br />2.0 <br />$15.00 <br />$30.00 <br />Total chromium, copper, nickel, zinc; EPA 200-7 <br />e. <br />2.0 <br />$55.00 <br />$110.00 <br />Lead, EPA 200.9 <br />AA <br />2.0 <br />$15.00 <br />$30.00 <br />Total cyanide, EPA 335.2 <br />.. <br />2.0 <br />$84.00 <br />5168.00 <br />HVOC's, EPA 8010 <br />AA <br />2.0 <br />$80.00 <br />$160.00 <br />4 <br />REPORT PREPARATION <br />Project Geologist <br />M <br />16.0 <br />$75.00 <br />$1,200.00 <br />Staff Geologist <br />hr <br />8.0 <br />$65.00 <br />$520.00 <br />Senior Geologist <br />h, <br />8.0 <br />$105.00 <br />$840.00 <br />Draftsman <br />h< <br />5.0 <br />$45.00 <br />$225.00 <br />Clerical <br />2.0 <br />$35.00 <br />$70.00 <br />Total Amount511283.00 <br />Tax nate Tax <br />$17 283.00 <br />Total Estimated Cool <br />Meeee e <br />Name: REM <br />Dam: 09/08/2000 <br />T:: <br />Signature: <br />'If adddicml Ilma/metrWelBJCcgnlnlct ",.. we requlfed to c A plate the amps a work the MBI Invoice wtll be a4�e,d aowNingly. <br />