Laserfiche WebLink
40 CFR Ch. 1 (7-1-92 Edition) Environmental Protection Agency <br /> §403.5 <br /> e with the self-monitoring require. enforcement proceedings or in judicial ment order for starting construction, <br /> ats in i;403.12; completing construction, or attaining <br /> ) Randomly sample and analyze aches•Comply With the <br /> and <br /> effluent from industrial users and (tion requirements of 40uCTS part 125 final( )co�ur°to provide, within 30 <br /> duet surveillance activities in order the enforcement of national Pre- days after the due date, required re- <br /> supplied by industrial users, otos- treatment standards. These or at Ports such as baseline monitoring re- <br /> al and Contin dares shall include provision for at ports. 90-day compliance reports, peri- <br /> .al noncompliance least annual Public notification, in the odic self-monitoring reports, and re- <br /> Prrep <br /> Pretreatment <br /> standards. <br /> tareffludard. Inspect <br /> ct largest daily newspaper published in ports on compliance with compliance <br /> ificant Industrial User at least t the municipality in which the POTW schedules; <br /> D is located, of industrial users which, at (G)Failure to accurately report non- <br /> - a Year. Evaluate, at least once any time during the previous twelve compliance; <br /> Y two Years, whether each such r months,were in significant noncompli- (H) Any other violation or group of <br /> ificant Industrial User needs a ante with applicable pretreatment re- violations which the Control Author- <br /> to control slug discharges. For airements. For the purposes of this ity determines will adversely affect <br /> uses Of this subsection, a slug dis- Provision, an industrial user is in sig- the operation or implementation Of <br /> ge is any discharge of a non-rou- -W nificant noncompliance if its violation the local pretreatment Program. <br /> episodic nature,including but not meets one or more of the following cri- (3) Funding. The POTW shall have <br /> ed to an accidental spill or a non- teria: sufficient resources and qualified per- <br /> 'Mary batch discharge. The re- (A) Chronic violations of wastewater sonnel to carry out the authorities and <br /> of such activities shall be avail- discharge limits, defined here as those procedures described in paragraphs(f) <br /> to the Approval Authority upon in which sixty-six percent or more of (1)and(2)of this section.In some lim- <br /> st. If the POTW decides that a all of the measurements taken during ited circumstances, funding and per <br /> - <br /> eontrol plan is needed, the plan } a six-month Period exceed (by any sonnel may be delayed where (i) the <br /> contain- ata minimum, the fol- magnitude) the daily maximum limit POTW has adequate IeBal authority <br /> g elements: or the average limit for the same pol- and procedures to carry out the Pre- <br /> Description of discharge prat- lutant parameter; treatment Program requirements de- <br /> including non-routine batch dis- (B)Technical Review Criteria(TRC) scribed in this section, and (ii) a limit- <br /> es; violations, defined here as those in ed aspect of the Program does not <br /> Description of stored chemicals; which thirty-three percent or more of need to be implemented immediately <br /> Procedures for immediately noti- all of the measurements for each pol- (see $403.9(b)). <br /> the POTW of slug discharges,in- lutant parameter taken during a six- (4) Local limits. The POTW shall <br /> 9 any discharge that would vio. month period equal or exceed the develop local limits as required in <br /> a prohibition under 40 CFR product of the daily maximum limit or $403.5(c)(1), or demonstrate that they <br /> 3), with procedures for follow-upthe average limit multiplied by the ap- are not necessary. - - <br /> n notification within five days; - Plicable TRC (TRC=1.4 for BOD, (5)The POTW shall develop ar.�' im <br /> If necessary, Procedures to pre- TSS, fats, oil, and grease, and 1.2 for plement an enforcement response <br /> adverse impact from accidental all other pollutants except pH. plan. This Plan shall contain detailed <br /> including inspection and mainte- (C) Any other violation of a pre- procedures indicating how a POTW <br /> of storage areas, handling and treatment effluent limit (dally maxi- <br /> diwill investigate and respond to in- <br /> �r of materials, loading and un- - mum or longer-term average) that the stances of industrial user noncomph- <br /> operations• control of plant Control Authority determines has ante.The Plan shall,at a minimum: <br /> n-off, worker training, building L caused, alone or in combination with (f) Describe how the POTW will in- <br /> ;tainment structures or equip- other discharges, interference or pass vestigate instances of noncompliance; <br /> measures for containing toxo <br /> P through (including endangering the (ii) Describe the types of escalating <br /> - Pollutants (including sol- health of POTW personnel or the gen- enforcement responses the POTW will <br /> and/or measures and equip- �' eral public); take in response to all anticipated <br /> 3r emergency response; ar (D) Any discharge of a pollutant types of industrial user violations and <br /> nvestigate instances of noncom- r that has caused imminent endanger- the time periods within which re- <br /> with Pretreatment Standards meat to human health, welfare or to sponses will take place; <br /> qun'ements, as indicated in the the environment or has resulted in the (iii) Identify (by title) the official(s) <br /> and notices required under POTW's exercise of its emergency au- responsible for each type of response; <br /> or indicated by analysis, in- thority under paragraph (f)(1)(vi)(B) (iv) Adequately reflect the POTW's <br /> and surveillance activities de- of this section to halt or prevent such primary responsibility to enforce all <br /> in Paragraph (f)(2)(v) of this a discharge; applicable pretreatment requirements <br /> Sample taking and analysis (E) Pallor to meet. within 90 days and standards, as detailed in 40 CFR <br /> e collection of other informs- after the schedule date, a compliance 403.8(f)(1)and(f)(2). <br /> all be Performed with sufficient schedule milestone contained in a (6)The POTW shall prepare a list of <br /> Produce evidence admissible in local control mechanism or enforce- its industrial users meeting the crite- <br /> 29 <br />