Laserfiche WebLink
i <br /> F <br /> F., <br /> §403.18 40 CFR Ch. 1 (7-1-92 Edition nVironmental Protection Agency <br /> reasonably be expected to occur in the exercise of reasonable engine ' r as the notice of the original re- (2 <br /> absence of a bypass. Severe property judgment to prevent a bypass wlu�cll nest for approval of the modification desi <br /> damage does not mean economic loss occurred during normal periods o Lmder§403.11(b)(1)(t)(B). in <br /> caused by delays in production. equipment downtime or preventativ, (2) The POTW shall notify the AP- gra <br /> (b) Bypass not violating applicable maintenance;and royal Authority of any other (i.e., tial <br /> Pretreatment Standards or Require- (iii) The Industrial User submitted on-substantial) modifications to its (3 <br /> m.ents. An Industrial User may allow notices as required under paragraph etreatment Program at least 30 days ed i <br /> any bypass to occur which does not (c)of this section. rior to when they are to be imple- nor <br /> cause Pretreatment Standards or Re. (2) The Control Authority may ap. anted by the POTW, in a statement for <br /> quirements to be violated, but only if prove an anticipated bypass, after con. - to--that provided for in Pars- mo <br /> it also is for essential maintenance to sidering its adverse effects, if the Con, ph (b)(1)(i) of this section. Such 0 <br /> assure efficient operation. These by- trol Authority determines that it will on-substantial program modifications on <br /> passes are not subject to the provision meet the three conditions listed lii be deemed to be approved by the tre <br /> of paragraphs (c) and (d) of this sec- paragraph(d)(1)of this section. pproval Authority, unless the Ap- (: <br /> tioaroval Authority determines that a POI <br /> (c) Notice. (1) If an Industrial User 153 FR 40615,Oct.17,19681 odification submitted is in fact a <br /> knows in advance of the need fora substantial modification, 90 days after qui <br /> bypass, it shall submit prior notice to §403.18 Modification of POTW Pretreat• the submission of the POTW's state- al <br /> the Control Authority, ff possible at ment Programs. menti Following such "approval" by <br /> least ten days before the date of the (a) General Either the Approval the Approval Authority, such modifi- 153 <br /> bypass. Authority or a POTW with an ap. cations shall be incorporated into the <br /> (2) An Industrial User shall submit proved POTW Pretreatment Program pOTW's Permit in accordance with 40 - <br /> oral notice of an unanticipated bypass may initiate program modification at CFR 122.63(g). If the Approval Au- <br /> that exceeds applicable Pretreatment any time to reflect changing condi- thority determines that a modification <br /> Standards to the Control Authority tions at the POTW.Program modifica- reported by a POTW in its statement <br /> within 24 hours from the time the In- tion is necessary whenever there is a is in fact a substantial modification, <br /> dustrial User becomes aware of the significant change in the operation of the Approval Authority shall notify Dc <br /> bypass.A written submission shall also a POTW Pretreatment Program that the POTW and initiate the procedures <br /> be provided within 5 days of the time differs from the information in the in paragraph (b)(1)of this section. <br /> the Industrial User becomes aware of POTW's Submission, as approved (c) Substantial modifications. (l) 51. <br /> the bypass. The written submission under §403.11. The following are substantial modifi- <br /> shall contain a description of the (b) Procedures. POTW Pretreat. cations for purposes of this section: <br /> bypass and its cause; the duration of ment Program modifications shall be (i) Changes to the POTW'F legal Ru' <br /> the bypass, including exact dates and accomplished as follows: thonties; <br /> times, and, if the bypass has not been (1) For substantial modifications, as (it) Changes to local limits, which <br /> corrected,the anticipated time it is ex- defined in paragraph (c) of this sec. result in less stringent local limits: T, <br /> petted to continue; and steps taken or tion: UK) Changes to the POTW Is control <br /> Planned to reduce, eliminate, and pre. (i.) The POTW shall submit to the mechanism, as described in cx <br /> vent reoccurrence of the bypass. The Approval Authority a statement of the §403.8(f)(1)(W); f` <br /> Control Authority may waive the writ- basis for the desired modification, a Ov)Changes to the POTW's method sEd <br /> ten report on a case-by-case basis if modified program description (see, for implementing categorical Pretreat- <br /> the oral report has been received §403.9(b)), or such other documents ment Standards (e.g., incorporation by a <br /> within 24 hours. the Approval Authority determines to reference, separate promulgation, t; <br /> (d)Prohibition of bypass. (1)Bypass be necessary under the circumstances. etc.); <br /> is prohibited, and the Control Author- (ii)The Approval Authority shall ap- (v) A decrease in the frequency of <br /> ity may take enforcement action prove or disapprove the modification self-monitoring or reporting required <br /> against an Industrial User for a based on the requirements of of industrial users; <br /> bypass,unless; §403.8(f), following the procedures in (vll A decrease in the frequency of <br /> (i) Bypass was unavoidable to pre- §403.11(b)-(f). industrial user inspections or sampling < <br /> vent loss of life, personal injury, or (iii) The modification shall be incor by the POTW; - <br /> severe property damage; Porated into the POTW's NPDES (Vii) Changes to the POTW's confi- <br /> (ll) There were no feasible alterna- permit after approval. The permit will dentlality procedures; ' <br /> tives to the bypass, such as the use of be modified to incorporate the ap- (Viii) Significant reductions in the <br /> auxiliary treatment facilities, reten- proved modification in accordance. POTW's Pretreatment Program <br /> re-tion Of untreated wastes, or mainte- with 40 CFR 122.63(8). sources (including personnel commit- <br /> nance during normal periods of equip- (iv) The modification shall become' ned�equipment, and funding levels); <br /> ment downtime. This condition is not effective upon approval by the Ap- (�) <br /> satisfied if adequate back-up equip- proval Authority. Notice of approval: dip) Changes in the <br /> e POTW's icesdge <br /> meat should have been installed in the shall be published in the same newsps- <br /> 48 49 <br />