Laserfiche WebLink
Frank C. Alegre Trucking Company,Inc. 4203-F2A <br /> Former Trucking Facility May 5, 1997 <br /> DRAINAGE POND REMEDIATION WORK PLAN Page 3 <br /> Renort Preparation <br /> A soil remediation report will be prepared which will summarize the field and laboratory findings, <br /> along with documentation regarding the off-site disposal of the fill material. The report will also <br /> provide recommendations for further characterization and/or remediation, if necessary. The report <br /> will be prepared and signed by a State of California Certified Hydrogeologist. <br /> We are pleased to have the opportunity to provide this work plan. If you have any questions <br /> regarding the proposed scope of the field or laboratory services,please contact our office. <br /> Very truly yours, <br /> ENGEO INCORPORATED Reviewed by: <br /> hawn Munger Brian Flaherty v <br /> Certified Hydrogeologist 413 Certified Engineering Geologist 1256 <br /> Vice President <br /> sm/lb:pin <br /> Attachments: Health and Safety Plan <br /> Table I <br />