Laserfiche WebLink
• Page 1 of 1 <br /> Muniappa Naidu [EH] <br /> From: John Robin Dohnrobin@proactivepkg.com] <br /> Sent: Thursday, November 06, 2008 11:13 AM <br /> To: Frank Tucker <br /> Cc: Muniappa Naidu [EH]; Jesse Acosta; John Scott <br /> Subject: ALAR batch treatment and testing <br /> Attachments: alar ph test form.doc <br /> I wanted to give you an update on redesigning the discharge of the ALAR waste water system; <br /> 1. We have the plumbing parts and pump on order so we can modify the discharge to go into our 3000 gallon <br /> tank and be able to sample the batch before being discharged. <br /> 2. 1 have made a log for the operator to fill out when doing batches (see attached). <br /> 3. We have a work desk on order for the operator to keep the solutions, meter, and log in a central location. <br /> 4. We are storing the plate solution and will be hauling it off as we had discussed. <br /> 5. We are still working on the permit application paperwork and drawings. <br /> 6. 1 should be able to give you records of the testing that has been done at our sister facility by next week. <br /> 1/30/2009 <br />