Laserfiche WebLink
i <br /> O <br /> 0 <br /> SfjD Keni Miller, Letter dated 8/4/2005-North YES D/scussed the Sodium Hypochlorite Drum/Carboy 10/2412005 <br /> End Warehouse Item No. 4-Rooms Packaging Area during the meeting. Submit Plan <br /> buil Ings or areas used for bye storage of <br /> hazc rdous materials liquids in individual Implement <br /> vesz is having a capacity of more than 55 Changes 30 days <br /> gall ns or when the aggregate capacity of from approval by <br /> mu pie vessels exceed 1000 gallons shall SFD(and <br /> be vided with spill control to prevent the building permit <br /> flow of liquids to adjoining areas. Floors in issuance if <br /> Ind r loCdtionS and similar surfaces in required) <br /> out r locations shall be constructed to <br /> con in a spill from the largest single vessel <br /> by a of the following methods• CFC, Sec. <br /> m 800 .1.3.2(Spill Control).A. Liquid--tight <br /> v s!o or recessed fiaors in indoor <br /> C* Iota ons or similar areas in outdoor <br /> a lata ons. B.Liquid-light floors in Indoor <br /> laca bns or similar areas In outdoor <br /> v loca Ions provides with liquid-bghtladed or <br /> rece ed sills of dikes, or C. Sumps and <br /> systems <br /> SFD Ken Miller, Letter dated B/4/2005-North YES SCCO to address the flooring, curb and tank hold- 10/20/2005 <br /> End Warehouse Item No. 5-The large downs <br /> soot im hydroxide tank showsa history of <br /> N spill Ve with stains and degrading of the 10/13/2005 Contacted Mark Fant=l, PE, 10/20/2005 <br /> oD <br /> fiboi mg. The hydroxide has damage/the Siegfried Engineering-Meeting Set for Contract <br /> tank hold-downs, damaged the curb and 10/19/2005 w/Engineer for <br /> dam Ved the buildings steel beam for the Review <br /> o ea side bearing wall. <br /> N <br /> N <br /> n 7 i <br /> H <br /> N <br /> 0 <br /> 0 <br /> N• <br /> ti <br /> o I <br /> H <br />