Laserfiche WebLink
I <br /> I <br /> 5Fp See ent Miller,Letter dated 8/4/2005— YES SCCO to contract with electrical contractor to 10/28/1005 <br /> Gas corn Item Ne. 1—Emergency power ven/y circuits Sutmnitrepart <br /> shal be provided in Neu of standby power 11/14/1005 <br /> f fora .Exhaust ventilation,Including the Resolve any <br /> po r supply for treatment systems, b. defrdenctes <br /> Ga election systems, c. Emeryency alarm <br /> syst ,and d. tiemperature-control <br /> sys CFC Sec:8=3.1.4(Emergency <br /> Po rJ <br /> SFp See Miller,Letter dated 8/4/2005— YES Provide plan to Kent MlNerfor approval 1111412005 <br /> Submit Plan <br /> I Gas com Item No.2—Gas rooms shall be <br /> des ned to.CFC,Sec. 80033.1.3.5 <br /> ntsy&ems), a. Operate ata <br /> v <br /> n Me pressure In relatfou to Me <br /> sur nding area,and b. D/rect Me exhaust <br /> d Ven 7ation to and exhaust system <br /> v <br /> s. <br /> d <br /> I <br /> I <br /> W I <br /> h <br /> W j <br /> IN <br /> W <br /> m <br /> N <br /> Ci <br /> ~� I <br /> w <br /> O <br /> 0 <br /> N, <br /> O <br /> .i e <br />