My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
8372
>
2200 - Hazardous Waste Program
>
PR0539709
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2018 1:21:55 PM
Creation date
11/6/2018 8:39:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0539709
PE
2220
FACILITY_ID
FA0017952
FACILITY_NAME
PACIFIC SOUTHWEST IRRIGATION CORP
STREET_NUMBER
8372
Direction
S
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18308005
CURRENT_STATUS
01
SITE_LOCATION
8372 S JACK TONE RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\J\JACK TONE\8372\PR0539709\COMPLIANCE INFO .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • iIECEIVED <br /> Pacific Southwest Irrigation Training: FEB 24 2015 <br /> Date: 2.9.14 Safety Training ENVIRONMENTAL <br /> Your training today will generally cover these areas Safety Training:General Awareness,Basic Safety Training,Function Specific,Haz- <br /> Comm./Right to Know,Material Interaction,Hazmat Security,Other Environmental Hazards <br /> Introduction: <br /> Why we are here? <br /> • Applicable laws and regulations; <br /> • Required Safety Training <br /> • Hazardous Materials <br /> • Hazardous Wastes <br /> • Material Safety Data Sheets&• Hazard communication related to health and safety; <br /> • Control and containment procedures; <br /> • Methods for safe handling of hazardous Chemicals Substances and Wastes;PPS's <br /> • Hazardous Materials and Wastes-Clean up procedures—internal and external <br /> • Fire hazards of materials/processes <br /> • Conditions likely to worsen emergencies; <br /> • Coordination of emergency response; <br /> • Notification procedures;Incident or Spill <br /> • Communication and alarm systems; <br /> • Personal protective equipment review and who is in charge! <br /> • Where your site's Emergency Evacuation Reassembly location and what are your re-entry procedures? <br /> Important Items - <br /> What are your Company procedures on packaging and labeling Hazardous wastes? <br /> • What are your on-site management storage requirements? <br /> Who are in charge of Proper use of safety equipment and hazardous waste management supplies? <br /> Does your company transport hazardous waste off site?If yes what are your transportation requirements? <br /> How do you interact with waste haulers and disposal sites including manifesting? <br /> Who conducts and documents weekly inspections,and what are you required to inspect <br /> Who is in charge of the training program and how many days does an employee have before he needs to be trained before handling <br /> Hazardous waste? <br /> Employees need to be trained before handling hazardous waste/materials unless under supervision within_6 months all employees <br /> need to have an annual refresher course.The documentation of all training records needs to be filed until the 3o years of the facility on all <br /> active employees.Non active employees need to be kept for 30 years. <br /> Where are the training records kept? <br /> Where are your electrical,water and gas shut offs located? <br /> How do you interact with waste haulers and disposal sites including manifesting? <br /> Who conducts and documents weekly inspections,and what are you required to inspect <br /> Who is in charge of the training program and how many days does an employee have before he needs to be trained before handling <br /> Hazardous waste? <br /> Employees need to be trained before handling hazardous waste/materials unless under supervision within_6_months all employees <br /> need to have an annual refresher course.The documentation of all training records needs to be filed until the 3o years of the facility on all <br /> active employees. Non active employees need to be kept for 30 years. <br /> Where are the training records kept? <br /> Where are your electrical,water and gas shut off located? <br /> Drums and Pails—oil,lids,wastes,cleaning,recycle? <br /> Matt will highlight and train personnel on the required SPCC plan and the PSWI's Contingency/Action plan. <br /> Video on Spills <br /> • <br /> Quiz&Answers <br /> Questions <br />
The URL can be used to link to this page
Your browser does not support the video tag.