Laserfiche WebLink
2) The main water valve for the entire building containing Bay 4 was modified to <br /> accept a lock that secures it in the CLOSED position. The standard procedure for <br /> shutting down facility operations now concludes with closing and locking this <br /> main valve. Mr. Holt initiates the facility morning start-up procedures. He has <br /> been clearly instructed to contact Mr. Merrill any time he finds the main water <br /> valve unlocked and/or not closed. If this occurs, the employee responsible for <br /> closing the valve during facility shutdown will be subject to disciplinary actions. <br /> t <br /> Main building water shut-off valve with <br /> lock modification <br />