Laserfiche WebLink
0 • <br /> X. Critique of Response & Follow-up <br /> ✓ Service Center Safety Conunittee has reviewed the entire action plan after each incident <br /> for effectiveness. Conduct a mock drill to evaluate the pian. Revise plan as needed. <br /> (Check box when completed) <br /> XI. Emergency Equipment <br /> The Service Center has at least one hazardous material emergency supply cabinet in each <br /> building (Dock, Shop) in close proximity to all risk areas and readily accessible by all <br /> employees. <br /> The cabinet should include at a minimum: <br /> Personal protection equipment: eye goggles, rubber gloves, rubber boots, and a protective <br /> apron. All equipment should be kept clean and ready for use or a disposable type should be <br /> used. Date checked: �tl I (Check and replenish quarterly) <br /> Cleanup tools: a plastic spark resistant shovel, broom, chemical neutralizer, and <br /> two-part rim patch kits. Date checked: )I / / (Check and replenish quarterly) <br /> Absorbents: oil dry or other organic absorbent, booms, and absorbent pads. <br /> Date checked:(Check and replenish quarterly) <br /> Specify location of recovery drums and liners: <br /> XII. Emereencv Telephone Numbers <br /> Emergency Response Contractor: Contact Chemical Help Line at 1-800-395-5d 6. <br /> Local Fire Department: q (( <br /> Emergency iNiedical Service: 911 <br /> Medical Clinic or Hospital: _ 20 11 /6 <br /> XIII. Plan Imolementation: <br /> 1. Completed plan should be an approved product of the Service Center Safety Committee. <br /> 2. Completed plan should be reviewed with all personnel that have critical responsibilities for <br /> implementing the plan, i.e. Medical Evaluator, Service Center Evacuation Coordinator. and <br /> Supervisors. <br /> 3. The Service Center Emergency Action Floor Plan/ Sitc Plan showing planned Service Center <br /> evacuation routes and places of refuge should be posted on Service Center bulletin boards. <br /> Notification of the location for this Hazardous Material Emergency (Response)Action Plan <br /> should also be posted. <br /> 4. There should be only one plan for the entire facility including specifics for all :ueas, <br /> buildings. The plan should be posted in all separate buildings. The posting L:an include the <br /> Page 6 or 13 Issue Dale 06,O(Oo <br />