My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1815
>
2200 - Hazardous Waste Program
>
PR0220065
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 10:44:50 AM
Creation date
11/6/2018 8:40:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220065
PE
2220
FACILITY_ID
FA0001889
FACILITY_NAME
ALCO METALS
STREET_NUMBER
1815
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
1633006
CURRENT_STATUS
01
SITE_LOCATION
1815 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\N\NAVY\1815\PR0220065\COMPLIANCE INFO 1989 - 2001.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IJc �SILGAN <br /> f 1L:Q' �� CONTAINERS CORPORATION <br /> �V1C <br /> 93��� r 1815 Navy Drive <br /> 5 P.O. Box 270 <br /> O <br /> f Stockton,California 95201 <br /> Telephoner(209)466-1031 <br /> September 13 , 1993 <br /> Jogi Khanna, M.D. M.P.H. <br /> Public Health Services <br /> San Joaquin County <br /> P. 0. Box 2009 <br /> Stockton, CA 95201 <br /> Re: Violation Corrective Actions - Ref. April, 7 , 1993 Inspection. <br /> Dear Ms. Khanna, <br /> The following corrective action has been taken in response to the <br /> violations cited during the April 7, 1993 inspection. <br /> Violation #3 : A manual pull station that is tied into our fire <br /> alarm system has been installed at the main door in <br /> the Hazardous Waste Building. A push button <br /> internal communication device has also been <br /> installed. Both systems were operational on <br /> 9/10/93 . <br /> The estimated completion date of 8/13/93 was not <br /> met due to the availability of explosion proof <br /> electrical components. <br /> A certification statement is attached. <br /> If further information is needed regarding these corrective actions <br /> please call me at extension 226. <br /> Regards, <br /> E. D. Stetson <br /> Plant Manager <br /> EDS/ap <br /> EDS138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.