Laserfiche WebLink
• <br /> Yes jLp Comment <br /> ContiDgency plan and Emergency procedures Lcont ) <br /> Chapter 15, Article 4 <br /> Does the plan list all emergency equipment <br /> including the location, physical description, and <br /> outline of capabilities? [66265s52(e) ] <br /> Does the plan include an evacuation plan with <br /> signals to begin evacuation, evacuation routes <br /> and alternate routes? [66265,52(f) ] <br /> Is a copy of the plan, and all revisions to the <br /> plane [66265,53-] <br /> (a) Maintained at the facility? <br /> (b) Submitted to all entities with designated <br /> response rolls? <br /> Has the plan been reviewed and inmediately <br /> amended, if needed, whenever: [66265.54-] <br /> (a) Applicable regulations are revised? <br /> (b) The plan fails in an emergency? <br /> (c) Facility changes require it? <br /> (d) The list of emergency coordinators changes? <br /> (e) The list of emergency equipment changes? — <br /> Is there at all times at least one employee at the <br /> generator's facility, or close by and on call, <br /> designated as EC, who is thoroughly familiar with <br /> all facility operations, wastes, records, layout, <br /> and emergency procedures, who has authority to <br /> commit the resources to carry out the contingency <br /> plan? [66265,55] <br /> Revised 7/15/91 page 23 <br />