My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
1313
>
2200 - Hazardous Waste Program
>
PR0506008
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:07:22 AM
Creation date
11/6/2018 8:41:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0506008
PE
2229
FACILITY_ID
FA0006195
FACILITY_NAME
Mepco Label Systems
STREET_NUMBER
1313
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
St
City
Lodi
Zip
95240
APN
04705013
CURRENT_STATUS
02
SITE_LOCATION
1313 S Stockton St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\S\STOCKTON\1313\PR0506008\COMPLIANCE INFO\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Valley Industries, LLC 7/28/2006 <br /> Certification of Return to Compliance <br /> For Valley Industries, LLC. <br /> Inspection date 6/01/06 <br /> Under the section of Notice to Comply issues, these corrections are in process. <br /> Point # Out of Compliance Description and actions to return to compliance <br /> 94. (SPCC PLAN)(CCR) (252 70-252 70.13 HY-) <br /> Failed to have SPCC plan signed off by a certified engineer. <br /> WE HAVE CONTRACTED WITH Blue Water and Assoc., Inc. out of San <br /> Francisco TO PROCEED WITH THE FOLLOWING STEPS TO <br /> CERTIFY OUR SPCC PLAN: <br /> 1. Review of current SPCC Plan—complete 6/22/06 <br /> 2. Site Survey and Plan action meeting—complete 6/23/06 <br /> 3. Finalize plan update— 7/28/06 with Action items listed <br /> 4. Plan Certification— 7/31/06 <br /> We are working under an agreed schedule with the certifying engineer on <br /> the target completion of the listed action items. <br /> Action Items for the SPCC plan are: <br /> 1. Design and build properly sized containment for the drum storage of <br /> fresh chemicals and hazardous waste materials now stored on the east side <br /> of the plant. <br /> 2. Install crash posts on the two outboard corners of the secondary <br /> containment area on the south side of the plant containing the holding tank <br /> for the paint line washer spent baths. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.