Laserfiche WebLink
Valley Industries, LLC.u ./ 4/29/2004 <br /> Under the section of Class II Violations, these corrections are either complete or in <br /> process of being corrected. <br /> Point # Out of Compliance Description and actions to return to compliance <br /> 10. (ILLEGAL OPERA TION.S)(CCR) 662 62.11 <br /> Failed to determine if following waste streams are hazardous: <br /> Floor Sweepings at laser <br /> Paint Ash at Hook Burner <br /> Dry Sweep from floor in Polishing area <br /> Retest Wheelabrator fines for STLC. <br /> Analyze caked metal in scrap bin on South side. <br /> ALL OF THE ABOVE HAVE BEEN EITHER JOINTLY SAMPLED <br /> WITH THE EHD OR SOLELY SAMPLED BY VALLEY INDUSTRIES. <br /> THESE WASTE STREAMS HAVE BEEN PACKAGED AND HELD AS <br /> HAZARDOUS WASTE UNTIL LABE RESULTS ARE IN. RESULTS <br /> HAVE BEEN RECEIVED AND DISPOSAL PROFILES ARE BEING <br /> DEVELOPED. <br /> 12. (PREPAREDNESS AND PREVENTION) (C(R) 66265.31 <br /> Facility not maintained to minimize the release of hazardous waste. Areas <br /> involved include floor around plasma fines collection filter, cutting fluid <br /> free flowing on South side of the plant form recycle bins and storage tent, <br /> and hydraulic oil leaking onto the floor under the Addison bender. <br /> THE PLASMA FILTER UNLOADING PROCESS AND <br /> HOUSEKEEPING OF THE AREA HAS BEEN CHANGED TO <br /> CONTROL THE WASTE FOUND ON THE FLOOR DURING THE <br /> INSPECTION. PROCESSES AND CONTAINER EXPOSURES TO <br /> RAIN HAVE BEEN CHANGED TO PREVENT FREE FLOWING OILS <br /> TO BE FOUND ON THE RECYCLED MATERIALS, REFER TO <br /> POINT 4 (a) & (d) FOR PREVENTATIVE ACTIONS TAKEN. <br /> REPAIRS HAVE BEEN MADE AND OIL CATCH PANS HAVE BEEN <br /> ADDED TO THE ADDISON BENDER TO CONTROL THE RELEASE <br /> OF HYDRAULIC OIL FROM THIS MACHINE. <br /> 15. (PREPAREDNESS ANI)PREVENTION) (C(K) 66265.32(c) <br /> Decontamination equipment not provided or working adequately in areas <br /> where hazardous waste is being generated or stored. <br /> WE HAVE PURCHASED SIX HARD PLUMBED EYEWASH AND <br /> SHOWER COMBO UNITS, THREE PLUMBED EYEWASH ONLY <br /> STATIONS, AND THREE NONE PLUMBED STATIONS. THREE OF <br /> THE NEW UNITS ARE INSTALLED AND THE REMAINING UNITS <br /> ARE IN THE PROCESS OF BEING INSTALLED. <br /> 30. (MANIFEST) (HS(,) 25160.2 <br /> Due to permit status, the facility cannot use consolidated manifests. <br /> MANIFEST COPIES WERE COLLECTED FORM THE VENDOR AND <br /> ADDED TO THE RECORD FILE. CORRECTION WAS COMPLETE <br /> ON 3/24/04. <br /> 2 <br />