Laserfiche WebLink
Nozzle Reinforcement Calcs <br /> See API-653 Section 8.5 <br /> Tank M Oily Water Separater NOTE: Nozzle Ht.Per API-650 column is for informational purposes only. <br /> Client: VALLEY INDUSTRIES This column indicates whether the height of the none meets the <br /> Location: LODI,CA present API-650 normal height requirement,but does not indicate <br /> THE REINFORCING CROSS-SECTIONAL AREA(X x Y)MUST BE LESS THAN THE FOLLOWING: whether it is in violation of API-653. <br /> (SEE NEXT PAGE FOR DEFINITIONS) <br /> X(Y)'(A)(B-X)-(4)(Tl(T)(2) (2XT)M <br /> Refamnce'remiate NR-1 <br /> Size Sheet %c+uri. a Nozzle Think inches Re-pad X x Y Reinf Area Approvd Nozz Ht <br /> ':ao Service IC Tar X-Axis Y-Axis TO Left Btm Riaht Thk in B in X in Yin Ain Tin S .is ===5=q.in. er API-653 perAPI-650 <br /> A 3 DRAIV Sc")10: 0.203 0.2':9 0.203 0.227 ::%.0 3.5 0.10 0.23 0.20 0.02 1.16 YES ==NO== <br /> $ SUCTION 0.172 0.242 0.178 0.243 7 3.5 0.10 0.24 0.17 0.02 1.12 YES <br /> C 3 DRAIN 0.194 0.194 0.197 0.239 7 3.5 0.10 0.24 0.19 0.02 1.18 YES <br /> O t ALARM 1.3 0.10 0.00 0.00 Not Req'd <br /> E 3 FILL 0.165 0.190 0.178 0.220 7 3.5 0.10 0.22 0.17 0.02 1.02 YES <br /> t <br />