Laserfiche WebLink
e <br /> Mr.Kyung Park <br /> October 11,2009 <br /> Page 4 of 4 <br /> P.E. Certification Statement <br /> I certify under penalty of perjury that this document and all attachments were prepared under my direction <br /> or supervision in accordance with a system designed to assure that qualified personnel properly gather <br /> and evaluate the information submitted. Based on my inquiry of the person or persons who manage the <br /> system,the information submitted is,to the best of my knowledge and belief,true,accurate, and <br /> complete. I am aware that there are significant penalties for submitting false information, including the <br /> possibility of fines and imprisonment for knowing violations[22 CCR Section 66270.11(d)]. <br /> Sincerely, <br /> HDR eZM a HDR company E$stt�w <br /> w a No.C61268 = Tel <br /> Gregory P. Meyer Al Williamson,P.E. Ly- <br /> Senior <br /> Senior Engineer Project Engineer/Manager * Up. 6 �l <br /> CIVIV <br /> Enclosure: Figure t—Site Plan 9�0F(,p\.\E <br /> Figure 2-500-gallon Waste Oil Tank <br /> C: Walter H.Kim,HDR I e2M <br /> Project File <br /> HDR I e'M one company lmany.soinnions <br />