Laserfiche WebLink
0 0 <br />Oil Spill Prevention and Preparedness for Rapid Response <br />Participant Name: Date: �g12�1 <br />7. Acceptable containment measures include: <br />(Check all that apply) <br />Spill Kits <br />P'Drip Pans <br />o Roping off the area <br />m Drain Covers <br />n Concrete Berms <br />8. Leaks and drips INSIDE of secondary containment do not need to be cleaned up. <br />TRUE? ALSL <br />9. A double walled tank uses an interstitial space as secondary containment in the event <br />the inner tank leaks. <br />/FALSE <br />10.Transferring oil from one vessel to another must be supervised at all times. <br />JRUEfFALSE <br />11. Which of the following are Best Management Practices (BMPs) for a double -walled tank? <br />(Check all that apply) <br />Mark the opening to the interstitial space with "DO NOT FILL" <br />P Keep the tank exterior clean and free of rust or corrosion <br />o Keep the interstitial opening open in case people need to access <br />-e <br />OCT 07 2ji5 <br />NVIRONVEA"1 i <br />Participant Handout SPCC Version 1.1-2014 Page 4 of 4 <br />