Laserfiche WebLink
i <br />i <br />Oil Spill Prevention <br />-and Preparedness for Ra id Response <br />Participant Name: �Ylo c�+��T <br />��-� Date: <br />7. Acceptable containment measures include: <br />;(Chec all that apply) <br />pill Kits <br />,1�4rip Pans <br />o Roping off the area <br />rain Covers <br />atoncrete Berms <br />Leaks and drips INSIDE of secondary containment do not need to be cleaned up. <br />TRU /FALSE <br />9. A double walled tank uses an interstitial space as secondary containment in the event <br />the inner tank leaks. <br />TRUE/ ALSE <br />10. Transferring oil from one vessel to another must be supervised at all times._ <br />TRU FALSE <br />11. Which of the following are Best Management Practices (BMPs) for a double -walled tank? <br />(Check -at[ that apply) <br />:�M�M�arkhe opening to the interstitial space with "DO NOT FILL" <br />Keep the tank exterior clean and free of rust or corrosion <br />o Keep the interstitial opening open in case people need to access <br />Participant Handout SPCC Version 1.1.2014 Page 4 of 4 <br />tJ <br />IVE <br />OCT 07 Lig <br />` , s <br />