Laserfiche WebLink
• 0 <br />,u Oil Spill Prevention and Preparedness for Rapid Response <br />Participant Name: Date: r �f Date: % - 2 � / r <br />7. Acceptable containment measures include: <br />(Check all that apply) <br />K -Spill Kits <br />Drip Pans <br />o Roping off the area <br />rain Covers <br />Concrete Berms <br />8. Leaks and drips INSIDE of secondary containment do not need to be cleaned up. <br />9. A double walled tank uses an interstitial space as secondary containment in the event <br />the inner tank leaks. <br />RUE ALSE <br />10. Transferring oil from one vessel to another must be supervised at all times. <br />ISR)FALSE <br />11. Which of the following are Best Management Practices (BMPs) for a double -walled tank? <br />(Check all that apply) <br />WMark the opening to the interstitial space with "DO NOT FILL" <br />/Keep the tank exterior clean and free of rust or corrosion <br />o Keep the interstitial opening open in case people need to access <br />OCT 07 2JI5 <br />Participant Handout SPCC Version 1.1-2014 Page 4 of 4 <br />