My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4715
>
2200 - Hazardous Waste Program
>
PR0514152
>
COMPLIANCE INFO 2002 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:11:57 AM
Creation date
11/6/2018 8:41:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2015
RECORD_ID
PR0514152
PE
2228
FACILITY_ID
FA0010067
FACILITY_NAME
JIFFY LUBE #2497
STREET_NUMBER
4715
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10437012
CURRENT_STATUS
01
SITE_LOCATION
4715 N WEST LN
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\W\WEST\4715\PR0514152\COMPLIANCE INFO 2002 - 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of San Joaquin Consolidated Contingency Plan <br /> for Hazardous Mntn+ N;.. <br /> FACILITY IDENTIFICATION <br /> BUSINESS NAME DATE <br /> Jiffy Lube Store#2497 FACILITY toM 11/28/08 <br /> EMERGENCY CONTAINMENT& CLEAN-UP PROCEDURES <br /> Containment,Prevention&Clean-Up <br /> check all that apply: <br /> Indicate your procedures for: ® provide structural PhYa barrier <br /> (eA. ® monitor for leaks, ruptures, pressure build-up, <br /> portable spill containment walls) eft <br /> 1. containing spills, releases, ----- <br /> firesorexplosions, & i ® provide absorbent physical barrier ® cover or block floor&I or storm drains <br /> 2. preventing and mitigating ❑ bush-in berm in work I storage area ❑ automatic fire suppression system <br /> associated harm to persons, i. Mop processes Worrations <br /> automatic/ l <br /> auomaceectronic® oPe ❑ _ equipment ahutcifaystem <br /> property &the environment: <br /> ® shut-off water, gas, electrical utilities as ® call 911 for public emergency responder <br /> ! appropriate I assistance I medical aid <br /> provide protective equipment for on-site ( ❑ eliminate sources of ignition for flammable <br /> response team hazards(e.g.fuel,propane) <br /> ® notify &evacuate persons in all threatened ® remove or isolate containers I area as <br /> I areas appropriate <br /> accountforevacuated persons immediately <br /> after evacuation call <br /> 1 ❑ other(specify): - <br /> check all that apply: <br /> Indicate your clean-up procedures: <br /> ® hire licensed hazardous waste contractor <br /> ® use absorbent material for spills with subsequent proper labeling,storage and hazardous waste <br /> disposal as appropriate <br /> ❑ suction using shop vacuum with subsequent proper labeling,storage and hazardous waste disposal as <br /> appropriate <br /> ❑ wash I decontaminate equipment wl containment&disposal of effluent l rinsate as hazardous waste <br /> ® provide safe temporary storage of emergency-generated wastes .—_— <br /> I <br /> ❑ other(specify): <br /> I <br /> 3r Evacuation Coordinator&Assembly Area <br /> 3.; <br /> Provide name I position of <br /> evacuation coordinator who will <br /> account for all on-site employees <br /> and I or site visitors after <br /> evacuation: Name: General Manager <br /> Identify I describe emergency speclfy South of Building Parking Area <br /> assembly area for evacuees: i <br /> Identify the location where your specify:Upper/Lower Ba <br /> evacuation route I map is posted: U pp y <br /> Other facility evacuation Specify:Customer Waiting and Office Area: Through entrance/exit doors; <br /> procedures: Upper Bay 1)Through entrance/exit doors or 2) Large Bay Doors; <br /> Lower Bay: Exit up stairs and through large bay doors. <br /> 2 <br /> .............................................................................................................................. <br /> Page CP 3: Emergency containment&clean-up procedures, Earthquake vulnerability <br />
The URL can be used to link to this page
Your browser does not support the video tag.