Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION X.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE -WI.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> 1. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as FACILITY NAME) r 3 <br /> BUSINESS SITE ADDRESS -579 V 0 L7& 11. CITY 104 <br /> II.EQUIPMENT VESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED ANNUALLY 490-3a <br /> Q ❑ 99.OTHER(Specify): 490-3b <br /> III.MONITORING LOCATIONS <br /> A1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. El 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634 90-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> -- VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. J3 CCR§2632,2634) - -SECONDARY CONTAINMENT IS: _❑_ a.DRY b.LIQUID FILLED El c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: - - 490-7. MODEL#:fLf%12-11i-al 490-8 <br /> LEAK SENSOR MANUFACTU 490-9. MODEL#(S): 0 a 490.10 <br /> 2.AUTOMATIC TANK GAUGIN Gj SYSTEM USED TO MO=SINGLE WALL TANK(S).(23 CCR§2643) 490.11 <br /> -- <br /> PANEL MANUFACTURER: 490-121k V . MODEL#: 49°'13 <br /> - ------ ------------------------- <br /> IN-TANK PROBE MANUFAC R: V� 490-14 MODELS : 490-15 <br /> -- -- ---�# - ------------------------ <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ---- - - - - - -- - - - Q <br /> d.MONTHLY ❑ e.OTHER(Specify): 490.17 <br /> ------------------------------- <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS cif 490-18 <br /> g•P� g•P• (Specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49°-21 <br /> 490-22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> NTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> SUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.D IQUID FILLED J11c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER: /� #: 490-31 <br /> 49°3° MODEL <br /> LEAK SENSOR MANUFACTURER: 49°32 2-- 490-33 <br /> + -- - MODEL#(Sq3�D$- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE) WN. a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 3 CCR§2636) 490-36 <br /> -------------------------------- <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490.38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.b.LEAK TESTS (23 CCR§2636) 490-39 <br /> ------------------------------ <br /> ELLD MANUFACTURER(S) 490.41, <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490.42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490.43 <br /> ELLD FAILUR.E/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. YES ❑b.NO 490.44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-07 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49049 <br /> 'Allowed for monitoring of unburied emergency enerator fuel piping only r HSC 25281.5 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)I. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ <br /> 99.OTHER(Specify) 490.52 <br /> 49x53 <br /> 10�°� � �1. �. <br /> UPCF UST-D(1212007)1/4 <br /> ��� <br />