Laserfiche WebLink
OOAAO OF T1IUSTEES %law <br /> J-46,• Culp,n,on, Pr,,. `�, <br /> SAN JOAQUIN LOCAL HEALTH DISTRICT <br /> r <br /> P.U1cl, E. vann SERVING <br /> ucc1, s,C'y. City of Lod$ <br /> A nlnon,n, Van Soron„n 1601 Eeat Hazelton Avenue, P, <br /> E,rl Plm,nld O. BOK 2009 San Joe County <br /> F,fn auab„ Stockton. California 95201 city of E,c,lon <br /> Daniel L. Flo,„ 209/166-6781 K <br /> City Or Ment , <br /> John 0. Most, M.O. City of Ripon <br /> William J. Wade City of Stockton <br /> Jeal Kllenne, M.O., M.P.H., Oleldcl Health 0111c„ Clly of Tracy <br /> Mary Anne low Sen Joaquin County <br /> r Sen Joaquin County <br /> Facility Name <br /> Address 10I U E <br /> Date of Inspection <br /> JEW <br /> Inspector <br /> MONITORING ALTERNATIVE A7 <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the liquic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> Annual precision test on tank and piping. <br /> tLTank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> _Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning, before opening. ) <br /> �If liquid level varies more than 1 % of the tank volume or 5 gallons , which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours , as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> Completed by the dates specified. <br /> Uprecision test (s ) must be performed by 1_ —7and results submitted to this <br /> Office within 30 days of the test. -- <br /> Tank gauging must be started inmediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to thr specified <br /> date. <br /> 4/86 UGT 3 <br />