My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
14175
>
2300 - Underground Storage Tank Program
>
PR0234383
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:49:35 AM
Creation date
11/6/2018 9:17:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0234383
PE
2361
FACILITY_ID
FA0003670
FACILITY_NAME
REYNOLDS PACKING CO QUALITY BIN
STREET_NUMBER
14175
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
051-050-05
CURRENT_STATUS
02
SITE_LOCATION
14175 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 26\14175\PR0234383\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
9/29/2017 9:47:19 PM
QuestysRecordID
3655159
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o-w�'`vrces c <br /> STATE OF CALIFORNIA r <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B ,� `�� <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: r <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK 1.D.# V ID^ B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLONS: 1 <br /> II.TANK CTENTS IFA-1 IS MARKED,COMPLETE ITEMC. <br /> A. FlYll MOTOR VEHICLE FUEL ❑ 4 OIL B. C• ❑ la REGUL R ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ BO EMPTY 1 PRODUCT ❑ 1 PREMIUM ❑ 4 GASAHOL 7 METHANOL <br /> ,I�UNLEADED ❑ 5 JET FUEL <br /> 77] 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN E:7] 2 WASTE 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C A S # <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLES INBOX DAND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL, ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> ❑ 1 BARE STEEL ❑ 2 5TAlNLESS STEEL ❑ 3 FIBERGLASS <br /> B. TANK _] 4 STEEL CLAD W1 FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100'/ METHANOL COMPATIBLE WIFRP <br /> {Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING E:] 4 PHENOLIC LINING <br /> C.INTERIOR <br /> LINING F—] 5 GLASS LINING ❑ 6 UNLINED UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 1009 METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP 2 COATING ❑ NYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ��ZUNKNOWN 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV. PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A9 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A&95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELWICOATING A U B 1009 METHANOLCOMPATIBLEW/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTIONU 5 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 7 MONITORING 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITtlALMONITORING 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> L E TI AT D DATE LAST USED(MOIDAYIYR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YESNO <br /> SUBSTANCE REMAINING GALLONS INIrRT MATERIAL? ❑ ❑ <br /> THIS FORM HAS BEEN COMPLETED CINDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, 1S TRUE AND COPPE'CT <br /> APPLICANTS NAME DATE <br /> (PRINTED&SIGNATUREy <br /> 4 <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW \` <br /> CDUNTY# JURISDICTION# Lit # TANK# <br /> STATE I.D.# <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B )7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FOF10034B-RS <br />
The URL can be used to link to this page
Your browser does not support the video tag.