Laserfiche WebLink
STATE OF CALIFORNIA o <br /> STATE I.NATER RESOURCES CONTROL BOARD ?� Y• <br /> 3'l�`er <br /> AL <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM BJol <br /> a� <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: -f <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# 8. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAYNEAR) D. TANK CAPACITY 1N GALLONS: <br /> ILTANKCONTENTS IFA-119 MARKED,COMPLETE ITEM C. <br /> A. U 1 MOTOR VEHICLE FUEVNAMESUBSTAONCE <br /> IL B. C. 1 UNLEADED ❑ 3 DIESEL <br /> ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM 0 EMPTY ❑ 1 PRODUCT ❑ ib PREMIUM ❑ 4 GASAHOL <br /> UNLEADED ❑ 5 JET FUEL 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT5 UNKNOWN 2 WASTE ❑ 2 El <br /> LEADED <br /> ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER STOREp <br /> C.A.S.#: <br /> IPI. TANK CONSTRUCTION MARK ON ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B TANK ❑ 1 BARE STEEL 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 1003; METHANOL COMPATIBLE WIFRP <br /> (Primary Tank) ❑ 9 BRONZE 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTE <br /> RIOR❑ 5 GLASS LINING ❑ 6 UNLINED <br /> ❑ 95 UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 1 A METHANOL? YES— NO� <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 C TING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 N E ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEA OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A FABOVEGROUNOO U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 !RES URE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOU$ WALT. A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINL SS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCR E A U 7 STEEL WI COATING A U 8 100% METHANOL COMPATIBLE W1FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHOD PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION E] 1 AUTOMATIC LINE LEAK DETECTOR [:] 2 LINE TIGHTNESS TESTING 9 S ! L <br /> MONRORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> �I 1 VISUAL CHECK ❑ 2 INVENTORY RECONOLIATION 3 VADO E MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NON ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI,TANK CLOSURE INFORMATION <br /> 1.rSTIMATEl D LAST USED(MCiDAYNR) 2.ESTIMATED QUANTITY 0 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENAL TY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> IPRIN7ED 8 91GNATUPEI DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW ti l ) 1 <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.## LLL <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE -PERM IT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION.FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br />