Laserfiche WebLink
NEW U- INSTALLATION INSPECTION RE & D <br /> FACILITY NAME: S�i TAWK MODEL/MATERIAL <br /> ADDRESS: /4075 0. N a SWEEPS# "/-3 TANK* 3-1- -- 1 L# <br /> CAPACITY: I DQ PRODUCT: <br /> A 0 <br /> P I ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P S WIT# MAINIFACTURES WRITTEN SPECIFICATIONS <br /> R A <br /> 0 P <br /> V P <br /> E R <br /> D 0 <br /> V <br /> E ITEM OR EQUIPMENT INSPECTED <br /> DATE D <br /> �5-� 1. UST PLANS SUBMITTED/ FEES PAID C0 Wlt (H+S CODE 25287, CCR 2635 (D) (8)) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP; PSI: HRSIMIW: BRINE(LIQUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: HRS/MIW: <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIW) (CCR 2635 (B) (4)) <br /> 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2635 (A) (4)) <br /> 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS; (COR 2635 (A)) <br /> 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (C) (2)) <br /> 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2635 (B) (5)) <br /> 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (8) (6)) <br /> 17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br /> 18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> 14. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> 21. "Cu FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> 22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br /> 23. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br /> COMMENTS: <br /> EH23— • , <br />