Laserfiche WebLink
D. Results of Testing/Servicin <br />Software Version Installed: I 2 3 ` <br />Complete the following checklist: <br />* In Section E below, aescnue HOW r,•,..•••... <br />E. Comments: <br />Is the audible alarm operational`? <br />Is the visual alarm operational? <br />Were sensors visually inspected, functionally tested, and confirmed operational? <br />FY <br />all <br />Were sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />all <br />not interfere with their proper operation? <br />to a remote monitoring station, is all communications equipment (e.g. modem) <br />If alarms are relayed <br />N/A <br />operational? <br />does the turbine automatically shut down if the piping secondary containment <br />❑ Yes <br />ClNo* <br />For pressurized piping systems, <br />system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />N/A <br />monitoring <br />shut -down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br />positive <br />shut -down due to leaks and sensor failure/disconnection? ❑ Yes; El No. <br />❑ Yes <br />❑ No* <br />Did you confirm positive <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />alarm visible and audible at the tank <br />1 N/A <br />mechanical overfill prevention. valve is installed), is the overfill warning <br />fill and operating properly? If so, at what percent of tank capacity does the alar trigger? <br />point(s) <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />Ll Yes* <br />No <br />list the manufacturer name and model for all replacement parts in Section E, below. <br />and pp )) <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that a 1 + <br />❑ Yes* <br />o4 No <br />❑ Product; ❑ Water. If yes, describe causes, in Section E, below. <br />settings?Attach set up reports, if applicable <br />Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure proper <br />operational per manufacturer's specifications? <br />Yes <br />❑ No* <br />Is all monitoring equipment <br />..a ...hon three deficiencies were or will be corrected. <br />* In Section E below, aescnue HOW r,•,..•••... <br />E. Comments: <br />