Laserfiche WebLink
09/19/2027 07:48 2094626171 STOCKTON PETROLEUM PAGE 02/08 <br />Ate. ..amu <br />SAN JOAQUIN COUNTX ENVIRONMENTALlIEALTH DEPARTMENT <br />UNOERGROUNDSTORAGETANK <br />A!i[ONTTOWNG PLAN - PAGE I <br />TYPE OF ACTION C3 I, NEW PLAN 2. CHANGE OF INFORMATION <br />PLAN TYPE ❑ MONITORING Ig IDENTICAL FOR ALL USTI AT THIS FACILITY. <br />Mor. <br />Check ofic item only) ❑ THIS PLAN COVERS OPI LY THE FOLLOWING UST-SYSTEM(S); <br />I. FACILITY INFORMATION <br />FACILITY TITY N (Agency Use Only) <br />FACILITY NAME <br />PACILITY SIT Ii ADDRESS <br />H. EQUI IPM.EN';ICSTIN ANA PREVENTIVE MAINTE ANCE <br />,Strata law mgnirra that testing, pravenlive maintenance. I d cslibm ion Of manimdng equipment (e.g., sensors, pmbts, lino leak deletions, etc.) be perfrmned in M(w, <br />accordinm with the cgnipmcnt mmmfacmrcrs' insttwAill ns, Or annually, whdr r is mote frequent. Such work must be perfonrted by gllfllifiad pelionnel. <br />MONITORING EQUIPMENT IS BF.RVICEnJ4 I.ANNUALLY ❑ 99, OTHER(Speciry):�`_` Mm, <br />lai. MONITORING LOCA IONS <br />This monitoring plan must include o Site Plan 5howinp, tl'e gcncrnl lnnk end piping Itlyaun and the lacatiOn5 whcic InOnhorin is <br />line leak dnector, monitoring system xn[rol pnncl, eparnm <br />tc,), Ifyon almady bave n dinaM, (c¢., cmlCat UST Monttarin Site P en from a Monitoring tmn Ofrnch seusm, <br />form, Mnrnrdous Msterlals Business Plan maD tAr;) whit';h shows all m aired infamnlion include It with this Ian, g R )stem CMification <br />IV. TAMC MONITORING <br />MONITORING IS PERFORMED USING THF FOLLCIINING METHOD(S); (Check all (hatupply) Mm <br />19 1 rONTINLIOUS ELECTRONIC MONI70RING,;IF TANK ANNULAR HNTERSTITIAL) SPACE(S) OR SECONDARY CONTA INMENT VAULTS) <br />SECONDARY CONTAINMENT IS DRYy� ❑ b. LIQUID FILLED ❑ C, UNDER PRESSURE 11 d. UNDER VACUUM Mu. <br />PANEL MANUFACTURER: M1' MODEL --,r—'/,f�� nls. <br />LEAK SENSOR MANUFACTURER: �ptlir2 (,Q Mia MODEL <br />El2. AU'1'pMATIC TANK GAUGING (ATG) SYSTE IN USED TO 40NI OR <br />S G_f WALL TA KIq <br />PANEL MANUFACTURER: MI' MODEL n: Mn, <br />IN -TANK PROUF MANI IFACTURBR: min. MODEL 1!(S): Mto. <br />LEAK TEST FREQUENCY: ❑ e. CON97NUOUS ❑ b. DAILYINIGHTLY [] c. WEEKLY Me, <br />❑ d, MONS'HLY ❑ Is. OTHER (Specify): M21. <br />PROGRAMMEDTES'PS: ❑ a. 0.1 S.a,h, ❑ h, 0.26.p.h. ❑ c, OTHER (Specify): MSl. Mia. <br />❑ 3. INVENTORY RECONCILIATION [j a, MANUAL PER 23 CCR §2646 ❑ b, STATISTICAL PER 23 CCR §2646.1 MN, <br />CI 4, WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR 42645 <br />TESTING PERIOD: ❑ a. 36 H(1 URS ❑ b.60 [.[OURS Mss <br />W 5, INTEGRITY TESTING PER 23 CCR $2643.1 <br />TEST FREQUENCY; a, ANNI.; ALLY ❑ b, BIENNIALLY 0 C. OTHER(SpMfy): Mu. M97 <br />6,VISUAL MONITORING DONE: a. DAILY ❑b. WEEKLY(Rmvnxwm.Pnrar.Il <br />99.OTHF,R (Specify)Mm. <br />_ V. PIPE MONUORING <br />MONITORING IS PERFORMED USING THE FOLLO'i'ANG METHOD(5)(Chmk all Oral apply) <br />�I I, CONTINUOUS ELECTRONIC MONITORING (I F PIPING SUMI'(S)(TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS; 1,1, DRY ❑ b. LIQUID FILLED ❑ e. UNDER PRESSURE ❑ d. UNDER VACUUM MJI. <br />PANEL MANUFACnTRER: ��y,1A._ � MU MODEL!!: �[.(�un M.m <br />LEAK SENSOR MANUFACTURER: l- `' ^fitl' MODEL.. u(s): �I9 H AEA f e,.pl Mas. <br />WILLA PIPING LEAK ALARM'nUr. 0, .1 PUMP(i.e„TUr(BINE)SHUTDOWN' ` Mw <br />a, YES 0 b. NO <br />,d WILL FAILLIREIDISCONNECTION OF THGiMpNITORING SW AUTOMATIC PUMP Sb1U'rDOWN7 �o. YES ❑ b. NO Msv <br />yn 2. MECHANICAL. LINE LEAK DrTECTOR (MI..LD) THAT ROUTINELY PERFORMS 3,0 gp.h. LEAK TESTS AND RESTRICTS E3 b. No OFF <br />PRODUCT FLOW W13EN A LEAK IS DETECTISD <br />MLLD MANUFACTUR,ER(s): V4 9 Q ✓ %jlt Msa. MODEL O(S): / i( a, p Man. <br />C] 3 ELECTRONIC LINE LEAK DFTECTOR (91,LD I THAT ROUTINFLY PERFORMS 3.0 Bp h, LEAK TESTS <br />ELLD MANUFACTURER: M'R MODEL M: Mm. <br />PROGRAMMED LINE INTEGRITY TESTS: o, MINIMUM MONTHLY 0.2 g,p.h. ❑ b, MINIMUM ANNUAL. 0.1h. Moo. <br />WILL ELLD OETECTION OF A PIPING LF-11.1KTRIGGER AUTOMATIC PUMP SHUTDOWN? g P nut. <br />WILL AILURFlDISCONNF.CTTON 1' a. YES ❑ h. NO TRIGGER AUTOMATIC PUMP SHUTDOWN? �.' a, YES [3 b, NO Mw, <br />❑ 4. INTEGRITYY TEST <br />STTING _ <br />TEST PRBQUENCY; © a, ANNUALLY ❑ b, EVERY3 YEARS a e. OTHER(Spooify) M•s. m. <br />$ SNISUAI. MONITORING DONE: a, DAILY ❑ b, W EEKLY+ ❑ C. MIN. MONTHLY ,@ EACH'nMP_ SYSTEM OPFRATED•• Mor. <br />• kemihMn:rnm•Mxaml "AnoNN fa mudlmrn;af mbxlM aneracxey mnnnw Tod mMoa¢453a1.5lbaN <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL RII QU(REME NTS POR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7, NO PRODUCT OR REMOTE FILL PIPING IS CCINNECTED TO THE UST(s) <br />❑ 99.OThleR (Spcciiy, <br />Rar¢Mn..trmpmp. v <br />