Laserfiche WebLink
MONIJORING SYSTEM CERTIFI*TION <br />For Uve &.41 urisdicllons hVilhin the Stale of California <br />Aillhorily Cited: Chapler 6.7, Heahh and S'gfety Code; Chaplcr /6, Division 3, Tide 13, California Code oj'2egulnlions• <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be <br />prepared for each monitoring system control panel by the technician who performs the work. A copy of this form mist p d [G� <br />the tank system owner/operator. The owner/operator must submit a copy of this form to the local agenzQa� �IinA&IS t M <br />within 30 days of test date. <br />A. General Information <br />FacilityName: nnlAr!-1, <br />Site Address:/ t WW' <br />Wy C, `/ZtJ y �-ia City: 41 1 i1oleI <br />/, <br />Facility Contact Person: Snq.4 Contact Phone <br />Make/Model of Monitoring System: `J e fG).P r k <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicate specific eauinment insmcted/servicwL- <br />SAti ; aAC<J'-" COUNT Y <br />ENVIRONMENTAL <br />lint@ it" P Et A R T tiitll r. <br />, — Zip: 9.6-;: 2- C <br />Date of Testing/Servicing: a'22_07 <br />Tank ID: 6r.f— <br />k ID: L <br />In -Tank Gauging Probe. <br />Model: � <br />Gauging Probe. <br />Model:Annular <br />Space or Vault Sensor. <br />Model:t/ZDnnular <br />fn-Tank <br />Space or Vault Sensor. <br />Model• �iPiping <br />Sump / Trench Seasons). <br />Model: <br />249.4ping <br />Sump / Trench Sensor(s). <br />Model: 7Oa <br />>ff Fill Sump Sensor(s). <br />Model: <br />2aR <br />❑ Fill Sump Sensor(s). <br />Model: <br />Mechanical Line Leak Detector. <br />Model: y n Z�C70 <br />Kvlechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other (s ecif equipment t e and model in Section E on Pae 2). <br />❑ Other (specify equipment t e and <br />model in Section E on Pae 2). <br />Tank ID: <br />Tank ID: <br />In -Tank Gauging Probe. <br />Model: mlA h 1 <br />❑ In -Tank Gauging Probe. <br />Model: <br />Annular Space or Vault Sensor. <br />Model: <br />t f J D <br />❑ Annular Space or Vault Sensor. <br />Model: <br />1K Piping Sump / Trench Sensor(s). <br />Model <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />Fill Sump Sensor(s). <br />Model: <br />7JBS <br />❑ Fill Sump Sensor(s). <br />Model: <br />Mechanical Line Leak Detector. <br />Model: LD 2b00 <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other (specify equip pent type and model in Section E on Page 2). <br />❑ Other (specify a ui ment t e and <br />model in Section E on Page 2). <br />D'Spenser ID: / `' Z <br />Di enser ID: �7 <br />Dispenser Containment Sensor(s). <br />Model: <br />24G <br />Dispenser Containment Sensor(s). <br />Model: Z ro <br />Ll Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />0 Dispenser Containment Float(s) and <br />Chain(s). <br />Di penser ID: 4 (p <br />Dispenser ID: 7f <br />Dispenser Containment Sensor(s). <br />Model <br />Z <br />)a Dispenser Containment Sensor(s). <br />Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />enser Containment Float(s) and Chain(s). <br />❑ Dis enser Containment Float(s) and <br />Chain(s). <br />enser ID: 'f <br />Dispenser ID: // F Zispenser <br />ris <br />Containment Seasons). <br />Model• <br />Zoo <br />CxDispenser Containment Sensor(s). <br />Model: 2ohear <br />Valve(s). <br />❑ Shear Valve(s). <br />s enser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and <br />Chain(s). <br />-If the facility contains more tanks or dispensers, <br />copy this form. <br />Include information <br />for every tank and rlisnpnspr nt flip f ril;ro <br />C. Certification - 1 certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this <br />information is correct and a Plat Plan showing the layout of monitoring equipment. For any equipment capable of generating Stich <br />reports, l have also attached a copy of the report; (c/reek al/ their app/v): KISyst se �/ I'd larm history re ort <br />Technician Name (print): �,U IP M;l p Iml Signature: M �y L't.0'a -le, <br />Certification No.: �f'' -,� C9T�O 0 ,� License. No.: O a — /1X•/ -5 <br />Testing Company <br />//Name: t TOZ1lA IC 5-t PhoneNojzo )Wgoi )q <br />Site Address:Ylb 2riD C+rr_-Cf Date of Testing/Servicing,03 /_7`)i/'97 <br />Pagel of3 _ .A <br />Monitoring System Certification <br />D. Results of Testing/Servicing <br />a- V <br />03101 <br />