My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998 REMOVAL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
8203
>
2300 - Underground Storage Tank Program
>
PR0231595
>
REMOVAL_1998 REMOVAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:39 AM
Creation date
11/6/2018 9:33:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998 REMOVAL
RECORD_ID
PR0231595
PE
2361
FACILITY_ID
FA0003591
FACILITY_NAME
JOHN M RISHWAIN
STREET_NUMBER
8203
Direction
E
STREET_NAME
STATE ROUTE 26
City
STOCKTON
Zip
95215-9536
APN
10114021
CURRENT_STATUS
02
SITE_LOCATION
8203 E HWY 26
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 26\8203\PR0231595\1998 REMOVAL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Locationn <br />0ACKFILL EXCAVATION CERTIFICATE • <br />ZC, <br />Owner P <br />P P <br />Phone No.�7_1 } <br />1 Q Z L�� l I <br />Contractor <br />SEMCO <br />Phone No. (209) <br />524-9653 License No. <br />449864 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e. load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12 lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock -self -compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />� prm[ <br />t I' nJ;^1 Y, <br />11, 11 e rent <br />'Sigti <br />attire <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.