My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_REMOVAL 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
8237
>
2300 - Underground Storage Tank Program
>
PR0502198
>
REMOVAL_REMOVAL 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:39 AM
Creation date
11/6/2018 9:35:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1987
RECORD_ID
PR0502198
PE
2381
FACILITY_ID
FA0005359
FACILITY_NAME
KALENDS AUTO WRECKING
STREET_NUMBER
8237
Direction
E
STREET_NAME
STATE ROUTE 26
City
STOCKTON
Zip
95215
APN
10113072
CURRENT_STATUS
02
SITE_LOCATION
8237 E HWY 26
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 26\8237\PR0502198\REMOVAL 1987.PDF
QuestysFileName
REMOVAL 1987
QuestysRecordDate
4/3/2018 6:25:32 PM
QuestysRecordID
3844317
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DIVISION <br /> SITE HEALTH AND SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE INFORMATION EVALUATION OF POTENTIAL. HAZARDS <br /> 1. Site Name: 1. Chemicals Hazards <br /> Address: (] Carcinogens: <br /> Contact Person: Phone No. [] Corrosives: <br /> Sweeps Number. [ ] Dusts: <br /> Proposed Date of investigation/inspection: [ ] Explosives: <br /> [] Flammables: <br /> 2. Description and brief narrative of inspection activity: [ ) Inorganic Gases: <br /> [ ] New UST Installation [ ) UAR Investigation [ ] Metals: <br /> [ ] Tank Closure in Place [ ] Tank/Pipe Repair ( ] Oxidizers: <br /> [ ] Tank/Pipe Removal [ ] Re-excavation []PCB's: <br /> [ ] Installation of Borings/Monitoring Wells <br /> PART III <br /> 3. Specific Site Information: REQUIRED PERSONAL PROTECTIVE <br /> Tank No. Tank Capacity: EQUIPMENT <br /> Tank Contents: Tank Age: <br /> Other: 1. Monitoring Equipment: (note: Monitoring <br /> instruments must be used for all operations <br /> 4. Type of Operation: unless appropriate rationale or restrictions are <br /> provided) <br /> S. Release History: [ ] Combustible Gas/Oxygen Meter <br /> Evidence of leaks/soil contamination: [ ] YES ( ] NO [ ] Detector Tubes (Specify) <br /> Documented Groundwater contamination: [ ] YES [ ] NO [ ] Photoionization Detector <br /> Background and description of any previous investigation (] Organic Vapor Analyzer <br /> or incidence: [ ] Other, specify: <br /> If monitoring instruments are not used, <br /> rationale or activity/area restrictions: <br /> 6. Potential Health and Safety <br /> Physical Concerns: (check all that apply & describe) <br /> [ ] Heat or Cold Stress: of (high ambient temp.) <br /> [ ] Noise Source: 2. Personal Protective Equipment <br /> [ ] Oxygen Deficiency: Level of Protection: [ ]A [ ]B [ ]C [ ]D <br /> [ ] Excavation: (falls, trips ,slipping, cave-ins) [ ] Hard hat <br /> [ ] Handling and Transfer of a Hazardous Substance: [ ] Safety glasses/goggles <br /> (fire, explosions, etc.) [ ] Steel toed/shank shoes or boots <br /> ( ] Confined Space entry: (explosions) ( ] Flame retardant coveralls <br /> [ ] Heavy equipment (physical injury& trauma resulting [ ] Hearing protection <br /> from moving equipment) [ ] Tyvek <br /> [ ] Respirator, circle: APR or SCBA <br /> [ ] Other, specify A/P cartridge: <br /> [ ] Safety vest <br /> 7. Anticipated Biological Hazards: [ ] Two-way communication <br /> [ ] Snakes [ ] Insects [ ] Rodents [ ] Poisonous Plants <br /> [ ] Other/Unknown (specify): PART IV <br /> PLAN APPROVAL <br /> 8. Narrative (provide all information which could impact Health <br /> and Safety, e.g., power lines, integrity of dikes, terrain, etc.): Plan Prepared by Date: <br /> Plan Approved by: Date: <br /> EH23081 (2/7/92) <br />
The URL can be used to link to this page
Your browser does not support the video tag.