Laserfiche WebLink
�z- - �1'�—$-�t pis" % 05/a�a _,� = � C� 1� - �7 <br /> 14 Deli or Dearer Addmss cm SnM Oen or cast <br /> From <br /> lea. <br /> 15. TANK TO TEST 16. CAPACITY [?Station Chan <br /> �r r �e 0 ca most acad"urate LjTank Manufacturers Chan <br /> Nominal Capacity acavedty conn available Ll Identity by pnshionGSI1ons J Company Engineering Date <br /> a / aIsthere doubt asto True Capacity7 Chains supplied with aide See Section"DETERMINING TANK CAPACITY" _ Other <br /> r Stick Readings Total Gat!ons <br /> 17. FILL-UP FOR TEST to Me in. Gallons ea.Reading <br /> Stick Water Bottom O <br /> before Fill-up Inven?Ory <br /> to% in. Gallons - O <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> • /� v� Product in full tank(up to till pipe) ¢/VJI_[/�— <br /> Tank Diameter y <br /> 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br /> USee manual sections applicable.Check below and record procedure In log(26).Water Observation Well level O A Stage 1 <br /> Da on Water in tank E] High water table in tank excavation F] Line(s)being tested with LVLLT Stage N <br /> m>m o 21. TEMPERATUREIVOLUME FACTOR (a)TO TEST THIS TANK <br /> N <br /> M'10 19. TANK MEASUREMENTS FOR (�'7 T( <br /> r�iv a 3 m Observed API Gnnnty—7_ Tamp. 'F Corrected API Gravil9�5 <br /> Onto TSTT ASSEMBLY <br /> �Q7 J$ <br /> a- <br /> Bottom of lank to Gretfe`................... --�-- 22. ThermaFSensor reeding alter Circulation /Za 756F <br /> nZ Add 30"for Y'L ................. dgds Barest <br /> Add 24"for 3"L or air seal ....... 23. Digits per°F in range of expected change <br /> dos <br /> Total tubing m assemble Approximate ........ <br /> 24 x (ob3 y7S_ g.Ikm, <br /> . 20. EXTENSION HOSE SETTING — total quantity in coefficient of expansion for volume change in this tank <br /> Tank top to grade• `Lfull tank(16 or 17) involved product per°F <br /> Extend hose on suction tube 6"or more rl 25 , O� �7y�Z -r / e QO/ O / tel'/ <br /> below tank top ._ ..... ........._. s =. G •. Thb la <br /> volume charge per*F(24) Digits per°F in test Voiurrte change per digit. test <br /> If Fill pipe extends above grade.use top of fill. - Range(23) Compute to 4 decimal places. factor{s) <br /> 26. 30. HYDROSTATIC 31. 38.NET VOLUME 39. <br /> VOLUME MEASUREMENTS M 34. TEMPERATURE COMPENSATION CHANGES ACCUMULATED <br /> LOG OF TEST P60CEDURES PRESSURE RECORD TO.OMI GAL USE FACTOR(a) EACH PEAOING CHANGE <br /> CONTROL <br /> }j <br /> 29. Snndpipe Lowell 35. 36 32. 3 e mea Temperatet N . rn <br /> eco <br /> 27. 28. Yradoct in Product Change Computation AAlestneM FdaLIa1 aMrnwe <br /> 0111[ Record details of setting up Aein Inches adns Graduate Replaced(-) Triennial Higher♦ (c) . lel= Volume Mmus u <br /> and running test.(the full No. eeglneing Laval to Sensor Lona,- Eipammb t '111A.until oeelwn <br /> EContract.. m. EunsapRan k <br /> length of line if needed.) of which 9adin Reading <br /> Product Rudinp Icl Contraction - Conuamm�7j [AIR Crswhl <br /> TIME Reading Renorad Rudinp Reading R¢ovwed h) a73(V)—a311T1 <br /> IH M.) <br />