My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
6505
>
2300 - Underground Storage Tank Program
>
PR0231259
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:44:54 PM
Creation date
11/6/2018 9:45:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231259
PE
2381
FACILITY_ID
FA0003841
FACILITY_NAME
CONTINENTAL CABLEVISION
STREET_NUMBER
6505
STREET_NAME
TAM O SHANTER
STREET_TYPE
DR
City
STOCKTON
Zip
95210
APN
09405025
CURRENT_STATUS
02
SITE_LOCATION
6505 TAM O SHANTER DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\T\TAM O'SHANTER\6505\PR0231259\REMOVAL 1995 .PDF
QuestysFileName
REMOVAL 1995
QuestysRecordDate
10/19/2017 9:41:38 PM
QuestysRecordID
3691483
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0. SCOPE OF WORK: <br /> Excavation and removal of(1) 4,000 gallon underground gasoline storage tank. <br /> Tank will be purged of all remaining residues, and these residues will be stored on site in <br /> 55 gallon D.O.T. approved drums until they are hauled away for disposal by a certified <br /> hazardous materials hauler. <br /> The tank will be inerted with a minimum of 30 lbs. of dry ice per 1,000 gallons of tank <br /> capacity. More ice will be added if necessary to displace the oxygen in the tank to a <br /> concentration level below the OSHA approved lower explosive limit. When this level is <br /> obtained the tank will be removed and samples will be collected per the approved work <br /> plan. <br /> 1.1. Responsibilities of Other Agencies Present: <br /> 1.1.1. The Environmental Health Department is responsible for approval <br /> and inspection of procedures, including excavation, sample <br /> procurement and integrity of work plan. <br /> 1.1.2. The Fire Department is responsible for inspection relative to safe <br /> procedures and condition of tank prior to removal. <br /> page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.