My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
7701
>
2300 - Underground Storage Tank Program
>
PR0231863
>
REMOVAL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:48:43 PM
Creation date
11/6/2018 9:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1997
RECORD_ID
PR0231863
PE
2361
FACILITY_ID
FA0004050
FACILITY_NAME
U-Haul Moving & Storage at Hammertown
STREET_NUMBER
7701
STREET_NAME
TAM O SHANTER
City
STOCKTON
Zip
95210
APN
094-030-24
CURRENT_STATUS
02
SITE_LOCATION
7701 TAM O SHANTER
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\T\TAM O'SHANTER\7701\PR0231863\REMOVAL 1997 .PDF
QuestysFileName
REMOVAL 1997
QuestysRecordDate
8/18/2017 5:18:49 PM
QuestysRecordID
3591501
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U_Haul <br /> Facility Number 71011 -23 <br /> `j�-pLfc��fi,�la California. <br /> HEALTH AND SAFETY PLAN <br /> Page 6 <br /> Preliminary arrangements will include the following: <br /> A. Meet with the U-Haul representatives and identify aboveground structures, overhead <br /> power lines, underground storage tanks and buried lines, etc., with drawings to be <br /> supplied by U-Haul; <br /> B. Contact Underground Service Alert (USA) a minimum of 4$ hours prior to excavation to <br /> locate buried sewer, water, gas, electrical, and telephone lines; and, <br /> C. Identify local emergency facilities and the emergency response community. <br /> Preparatory work arrangements will include the following: <br /> A. Establish the location of shutoff valves, power, water and control switches with the <br /> assistance of the U-Haul Facility Managers; <br /> B. Check emergency equipment; first aid equipment, fire extinguishers, absorbent material, <br /> etc.; <br /> C. Post appropriate signs, barricades, and emergency phone numbers. Signs shall state "No <br /> Smoking". Any source of ignition shall be at least 50 feet away from the excavation site; <br /> D. Tank contents will be positively identified before excavation and tank removal; and, <br /> E. All tanks will be monitored for flammability and oxygen content with a properly <br /> calibrated flammable/combustible gas analyzer and oxygen meter. Calibration of the <br /> units must be within the last three months with an approved tag on the unit. This <br /> information must be logged. <br /> 4.2 EXCAVATION AND REMOVAL OF UST'S <br /> The following is an outline of work activities to be performed at the site. <br /> • Nuisance dust shall be kept to a minimum at all times. A water hose will be on-site at all <br /> times during operation and shall be used to prevent the generation of dust around the general <br /> site. <br /> • It shall be confirmed that liquids have been removed by U-Haul prior to rinsing of the tanks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.