Laserfiche WebLink
BOARD OF TRUSTEES SAWMQUIN LOCAL-HEA-TH DISTRTcs+r SERVIHO <br /> Jamas Culbertson. Pres. r City of Lodi <br /> Palricla E. Vannuccl, Secy. San Joaquin County <br /> Anthonetls Van Spronsen 1601 East Hazelton Avenue, P. O. Box 2009 City of Escalon <br /> Earl Plmentel Stockton, California 95201 City of Manteca <br /> Fern Bugbos 209/466-6781 City Ripon <br /> Daniel L. Flores City of Stt ockton <br /> John D. Most. M.D. City of Tracy <br /> William J. Wade Jopl Khanna, M.O., M.P.H., District Health Officer San Joaquin County <br /> Mary Anna Love Sen Joaquin County <br /> Facility Name <br /> Address UC/ •� <br /> Date of Inspection Inspector <br /> MONITORING ALTERNATIVE #7 <br /> Limited to underground storage tanks which have infrequent inputs and withdrawals and <br /> where the ligltic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> _ _LZAnnual precision test on tank and piping. <br /> _ Tank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> _Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend). <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours.). <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> ✓If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less, between measurements, an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> 1 : Precision test(s) must be performed by lz�)—I— and results submitted to this <br /> office within 30 days of the test. <br /> Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office .prior to the specified <br /> date. <br /> 4/86 UGT 3 <br />