UNDERGROUND STORAGE TANK
<br /> RESPONSE PLAN—PAGE I (one corm per fac ily)
<br /> RDI•
<br /> TYPE OF ACTION ❑ 1.NEW PLAN ED 2.CI fAN013,OF INFOR.MA'1'ION
<br /> I. FACILITY INFORMATION
<br /> FACILITY 1T]Ii (Agunuy Usn Only) — —
<br /> BUSYNESS NAME(Same as FACILITY NAME)
<br /> 'Thornton 76
<br /> RUSTNESS SITE ADDRrUS Roa, crrY RM,
<br /> 8606 Thomtolu Road Stockton
<br /> II. SPILL CONTROL AND CLEANUP METHODS
<br /> This pian addresses unauthorized releases from UST systems and supplcmcnte the emergency response plans and procodures in the fneiliry's 1-hr,,nrdous Materials
<br /> Business Plan,
<br /> ➢ if sitto d0 so,facility personnel will take immediate mcaaures to control or stop any rcicuse(e,g.,activate pump shut a11,cto•)and,if nceeasary,safely remove
<br /> remaining hazardous material from the UST system,
<br /> A Any release to secondary cnntainment will be pumper[Or otherwise removed within a time consistent with the ability of the secondary containment system to
<br /> contain the hazardous material,but not greater than 30 calendar days,or sooner ifrequired by the local agcney. Recovered hazardous materials,unlca3 still suitable
<br /> for their intended use,will be managed as haznrdous waste,
<br /> Absorbent material will be used to contain and olein tip manageable spills of hazardous mntcrinls. Absorbent mntcrinl may he reused until it becomes too
<br /> saturated to be eMclive. 1t will then be managed properly,Uscd absorbent matcrial,reusable or waste,will be stnrcd in a properly laboled and gcglgd_pgat j=.
<br /> ➢ Facility personnel will determine whotber or not any water removed from secondary containment systema,or from clean-up activity,has been in contact with any
<br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste, If the water has n petroleum sheen (i.e„ rainbow colom), it is
<br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors, Witter(1lnznrdous or nnn-ha=dous)from sumps,spill containers,eta.
<br /> will not be disposed to storm wittcr systems.
<br /> We will review seeondery containment systems for possible dcterinration if any of the following conditions occur:
<br /> 1. 14arardous material in contact with secondary containment is not compatible with the material used for secondary containment;
<br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material coltcctcd in secondary containment;
<br /> 3. Hazardous matcrial, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or ncurralim
<br /> released producdwaste,:tad the added material or reautling mnterial from such a combination is not compatible with secondary containment.
<br /> III. SPILL CONTROL AND CLFA.N-UP EQUIPMENT
<br /> )<'ERIOAIc MArNTTNANCE:Spill control and clean-up equipment kept permanently on-site is listed in the fiaeillty's T-lnZardni�s MateriaVs Business Plan, Tbis
<br /> equipment is inspected at least monthly,and after each use,and supplies are revicnishcd an needed, Defective equipment is repaired or replaced As necessary.
<br /> E UIPMENT NOT PERMANENTLY ON-SI'Z'E 8 I'AVAILAiIi,E FOR LIST IF NEEDED: (Complete onl if a licablc_
<br /> rQUiPMENT LOCATION AVAILABILITY
<br /> RID, R2a, Atn.
<br /> A11. Rat. R31.
<br /> R12, R22,
<br /> AIS. tt23. R33.
<br /> TI e, R7,a, ILA.
<br /> R15.
<br /> IV. RESPONSIBLE PERSONS _
<br /> THF.FOLLOWING PFRSON(S)IS/ARE RFSPONSiBLE FOR AUTHORIZING ANY WORK NiLrCUSARY UNDER TH19 RESPONSE PLAN:
<br /> NAME Rao• TITLE R,50,
<br /> fllnar'it Rai Owner
<br /> NAME R4 1. TITLE � R51.
<br /> NAME Raz, T'ITLr ssn,
<br /> NAME . TITLr TS,,
<br /> V. MONITORING INDICATORS
<br /> JF ivIONITORING INDICATES A POSSIBLY:UNAUTI•IORIZBD RELEASE,STEPS TO VERIFY Ti•iL•RELEASE WILL BE MADE AS FOLLOWS;
<br /> []Additional system testing or data collection ®inspcetion by qualified persons ❑Recalibration of cgnipmcnt
<br /> Other:Tesler or Dceignnted Operator R60.
<br />
|