Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE I (one corm per fac ily) <br /> RDI• <br /> TYPE OF ACTION ❑ 1.NEW PLAN ED 2.CI fAN013,OF INFOR.MA'1'ION <br /> I. FACILITY INFORMATION <br /> FACILITY 1T]Ii (Agunuy Usn Only) — — <br /> BUSYNESS NAME(Same as FACILITY NAME) <br /> 'Thornton 76 <br /> RUSTNESS SITE ADDRrUS Roa, crrY RM, <br /> 8606 Thomtolu Road Stockton <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This pian addresses unauthorized releases from UST systems and supplcmcnte the emergency response plans and procodures in the fneiliry's 1-hr,,nrdous Materials <br /> Business Plan, <br /> ➢ if sitto d0 so,facility personnel will take immediate mcaaures to control or stop any rcicuse(e,g.,activate pump shut a11,cto•)and,if nceeasary,safely remove <br /> remaining hazardous material from the UST system, <br /> A Any release to secondary cnntainment will be pumper[Or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner ifrequired by the local agcney. Recovered hazardous materials,unlca3 still suitable <br /> for their intended use,will be managed as haznrdous waste, <br /> Absorbent material will be used to contain and olein tip manageable spills of hazardous mntcrinls. Absorbent mntcrinl may he reused until it becomes too <br /> saturated to be eMclive. 1t will then be managed properly,Uscd absorbent matcrial,reusable or waste,will be stnrcd in a properly laboled and gcglgd_pgat j=. <br /> ➢ Facility personnel will determine whotber or not any water removed from secondary containment systema,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste, If the water has n petroleum sheen (i.e„ rainbow colom), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors, Witter(1lnznrdous or nnn-ha=dous)from sumps,spill containers,eta. <br /> will not be disposed to storm wittcr systems. <br /> We will review seeondery containment systems for possible dcterinration if any of the following conditions occur: <br /> 1. 14arardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material coltcctcd in secondary containment; <br /> 3. Hazardous matcrial, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or ncurralim <br /> released producdwaste,:tad the added material or reautling mnterial from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLFA.N-UP EQUIPMENT <br /> )<'ERIOAIc MArNTTNANCE:Spill control and clean-up equipment kept permanently on-site is listed in the fiaeillty's T-lnZardni�s MateriaVs Business Plan, Tbis <br /> equipment is inspected at least monthly,and after each use,and supplies are revicnishcd an needed, Defective equipment is repaired or replaced As necessary. <br /> E UIPMENT NOT PERMANENTLY ON-SI'Z'E 8 I'AVAILAiIi,E FOR LIST IF NEEDED: (Complete onl if a licablc_ <br /> rQUiPMENT LOCATION AVAILABILITY <br /> RID, R2a, Atn. <br /> A11. Rat. R31. <br /> R12, R22, <br /> AIS. tt23. R33. <br /> TI e, R7,a, ILA. <br /> R15. <br /> IV. RESPONSIBLE PERSONS _ <br /> THF.FOLLOWING PFRSON(S)IS/ARE RFSPONSiBLE FOR AUTHORIZING ANY WORK NiLrCUSARY UNDER TH19 RESPONSE PLAN: <br /> NAME Rao• TITLE R,50, <br /> fllnar'it Rai Owner <br /> NAME R4 1. TITLE � R51. <br /> NAME Raz, T'ITLr ssn, <br /> NAME . TITLr TS,, <br /> V. MONITORING INDICATORS <br /> JF ivIONITORING INDICATES A POSSIBLY:UNAUTI•IORIZBD RELEASE,STEPS TO VERIFY Ti•iL•RELEASE WILL BE MADE AS FOLLOWS; <br /> []Additional system testing or data collection ®inspcetion by qualified persons ❑Recalibration of cgnipmcnt <br /> Other:Tesler or Dceignnted Operator R60. <br />