My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
BILLING 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 3:28:22 PM
Creation date
11/6/2018 10:38:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2012-2015
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\3775\PR0231418\BILLING\BILLING 2012-2015.PDF
QuestysFileName
BILLING 2012-2015
QuestysRecordDate
5/26/2016 11:26:01 PM
QuestysRecordID
3096205
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 410-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY_ 4942 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> Chevron Station#98264 <br /> BUSINESS SITE ADDRESS 3775 Tracy Blvd 103 CITY TraCy,CA 95304 �1u <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)most be performed at the frequency specified <br /> by the equipment manufacturers'inswctions,or annually,whichever is mon;Creguent Such work most be performed by qualified pmonnel.123 CCR§2632,26M,M38,2641 <br /> MONITORING EQUIPMENT IS SERVICED ® I.ANNUALLY90.3. <br /> ❑ 99.OTHER(Specify): 4 <br /> 691436. <br /> IH. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR§263226341 490.4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) Chak(rr <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 4-5thatWITH AUDIBLE AND VISUAL ALARMS.123 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: N a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 4906 <br /> PANEL MANUFACTURER: Veeder-Root 49°'3- MODEL#: TLS-350 490.8. <br /> LEAK SENSOR MANUFACTURER: Veede-Root 490- MODEL#(S): LNuid Seuwr Serin 794380409 49x10_ <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).123 CCR§2613[ 49 H. <br /> PANEL MANUFACTURER 490.12. MODEL#: 490.1_ <br /> IN-TANK PROBE MAN UFA 49 14. MODEL#(S). 490.15. <br /> LEAK TEST FREQUENCY: ❑ a.C .DAILYINIGHTLY LI a WEEKLY 490'16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 49 17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.b. ❑ b.0.2 gp.h. ❑ c.OTHER(Specify): 419. <br /> 49o-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123 CCR§2646.11 49 20. <br /> [34.WEEKLY MANUAL TANK GAUGING(MTG)Iz3 cca§z64s1 TESTING PERIOD. ❑ a.36 HOURS ❑ b.60 HOURS 490.21. <br /> ❑ S.TANK INTEGRITY TESTING PER I23 cca g264311 49o-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 4942 24. <br /> ❑ 99.OTHER(Specify): 49x26. <br /> 49 27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check qB <br /> lhq!q <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 121 <br /> fEi CCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED [Id.UNDER VACUUM 49x29§263 . <br /> PANEL MANUFACTURER:Ve@der-Root 49 X MODEL#: TLS-350 49x31' <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 49032' MODEL#(S): Liquid Sensor Series 794380-208 490.4 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 49x34. <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490.35. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 gp.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR§26361 <br /> MLLD MANUFACTURER(Sf 4903°. MODEL#(S): 49 38. <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.123 ccR§26361 490.39 <br /> ELLD MANUFACTURER(S):Veeder-Root 690-40' MODEL#(S):PLLD Senn 84M88-001 49x41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ &MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49x42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49°43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ K NO 490.44 <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 44,49 <br /> ❑ 5.VISUAL PIPE MONITORING. 490.48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49°-49 <br /> `Miow forme mnng ofwbun4 me1gmly mibr fuel piptpmg_Iz)>a_HSC§25281.5 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.123 CCR§2630.N311 4v 50. <br /> ❑ Z NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 49 5r <br /> 0 99.OTHER(Specify) 4w53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.