My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995 1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
REMOVAL_1995 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2018 9:36:25 AM
Creation date
11/6/2018 10:42:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL_1995
FileName_PostFix
1995
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\3775\PR0231418\REMOVAL\1995 REMOVAL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 3775 Tracy Blvd. Tracy, CA <br /> Owner Cevron U.S.A Phone No. <br /> Contractor TBIf (tY. Psi Le v-A _ Phone No. 13 L` _ License No. 1{ b Z(o I3 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> g 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br /> was placed in the excavation in 12" lifts: <br /> X A. Pea gravel--smooch, rounded material not more than one-half (12) inch in diameter <br /> _ B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I herebv certifv that a Soil Engineer's Compaction Report«ill be submitted within 30 days ofroject completion,or submission <br /> of verification that the select material described above will be placed at a minimum c {ve (5 cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br /> Code Appendix Chapter 70. <br /> ame (' nnt) <br /> • Iitle.( rtnt) <br /> Signature <br /> Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.