Laserfiche WebLink
MATERIAL AND CONSTRUCTION CONFORM <br /> TO UNDERWRITERS LABORATORIES STANDARD <br /> U.L.2085. SECONDARY CONTAINMENT <br /> PROTECTED ABOVEGROUND TANK. <br /> EXCEEDS ALL REQUIREMENTS OF 19971FCI UFC T_________________________________________________________________________________________� <br /> STANDARD 79-7. (TEST CERTIFIED BY U.L.)AND <br /> APPENDIX IIF. <br /> BULLET RESISTANT UNDER 19971FCI UFC <br /> STANDARD 79-7. <br /> IMPACT RESISTANT UNDER 19971FCI UFC <br /> I O O O O O 0 0 <br /> STANDARD 79-7. <br /> U.L.LABEL FOR PROTECTED SECONDARY <br /> CONTAINMENT ABOVEGROUND TANK IS <br /> I <br /> REQUIRED. ' ' <br /> A <br /> I14'ID B C D J <br /> K 8 I8 1 E F G H 6. <br /> _ 18 18 18 30' <br /> ® moder moder <br /> A <br /> FlREGU.4RU <br /> ------------------------------------ <br /> 12'-5" 12'-5" <br /> Q,. <br /> �I 1 116 I II 1 116" ( <br /> 8"8'-361'—'361, 9,8„ g 441,1--441, B., <br /> 4 4 1"ANCHOR BOLTS 4 4 1}"ANCHOR BOLTS <br /> BASEPLATE DETAIL BASEPLATE DETAIL WITH <br /> ALTERNATE BOLT LAYOUT <br /> K 1 24" MANWAY <br /> MEETS 2007 CBC J 1 2" WN—PT MONITORNo ��: ONE (1) irtN Ro.: FG15000 <br /> MEETS 2006 IBC H 1 4" FNPT <br /> AIR TEST AT NOT LESS THAN 3 PSI NOR MORE THAN G 1 4" FNPT mode modem welding company of califomia,Inc. <br /> INNER TANK: PER U.L. 5PSI. PRIMARY TANK TO BE TESTED ALONE. F 1 4" FNPT 414ZKORAWLEYAVE FEEBN",CARn:n <br /> OUTER TANK:PER U.L. SECONDARY TANK TO BE PRESSURE TESTED WITH E 1 8" FNPT SECONDARY E-VENT <br /> PRESSURELISHED IN BY BLEEDING <br /> THIS FROM HALL BE <br /> D 1 8" FNPT PRIMARY E-VENT <br /> ACCOMPLISHED TANK <br /> I BY BLEEDING AIR FROM THE Robertson Engineering,INTERIOR: BARE,CLEAN OF PRIMARY TANK INTO THE SECONDARY TANK. C I 4" FNPT 8 B,Ino. <br /> DEBRIS AT NO TIME SHALL THE PRESSURE IN B 1 4" FNPT 15,000 GALLON U.L.2085 FIREGUARD TANK <br /> EXTERIOR:WHITE EPDXY THE SECONDARY TANK EXCEED THE A 1 6" PT FILL a" . L nn 10/04/10 Z: NONE <br /> PRESSURE IN THE PRIMARY TANK. SIZE O.D. LENGTH WEIGHT MARK QTY. SIZE FNTYre REMARKS e, ,b oa„N 1 1 127 IAJ <br /> 15,000 121" 29'-6" 39,000# SCHEDULE OF OPENINGS <br />