Laserfiche WebLink
L <br /> `.! FOI . <br /> ED <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN—(Page 2 of 2 <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Cneekall <br /> that a I <br /> 11^C MONITORING IS PERFORMED USING THE FOLLO ING METHOD(S) <br /> .1.CONTINUOUS ELECTRONIC MONITORING 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 49LLSIc <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) <br /> LEAK MONITOR MANUFACTURER: RJ¢ O 49035. MODEL M: / 490.56. <br /> LEAK SENSOR MANUFACTURER: 490-i7' MODEL q(S): ,94 r +'mss. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. r-1.YES ❑ b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. LW.YES ❑ b.NO 49060 <br /> FAILURE)DISCONNECFION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. FYES ❑ b.NO 4906[. <br /> Uv a <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. YES ❑ b.NO <br /> UDC CONSTRUCTION IS: Nf I.SINGLE WALL 2.DOUBLE WALL 45061 <br /> IF DOUBLE WALL: 490 r <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490"69A <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED avows <br /> Lg&&QUggjQ&(ELW MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.113 CCR12W.q <br /> M 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. w6a <br /> M 3.SPILL BUCKETS ARE TESTED ANNUALLY. m67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: +Sobs. <br /> M a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> M h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> M Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: - 49069. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> M THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490690. <br /> M OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49 %. <br /> ElCALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS ,49069d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49069e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 4m69r. <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 4v ft <br /> ❑ OTHER(Specify): 49069, <br /> 49o3m. <br /> M This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 4907. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> > The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> > Name(s)ofcontact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional commrnts here s indicate how m y pages with additional information on specific Mention" procedure are attached tp this plaq,„�. 4va7i. <br /> %ihJK o(/ Fi'CG rQai ec.—ro�itfEcNr9nliC.Fz oPG1 sw' (JQa /u�38 S~ <br /> M. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2. all conditions that indicate a possible release are investigated,and 3.)all monitoring records are maintained properly. <br /> - -THE FOLLOWING-PERSONS)-ARE-RESPONSIBLE-FOR.PERFORMING.THE MONITORING.AND EQUIPMENT MAINTENANCE:_ ._ . . <br /> NAME: 47-71 TITLE: 490.71 <br /> NAME: 490-74 TITLE: 490.75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-u ion. <br /> XII NER/OP9AATOR SIGNATURE <br /> CERTIFICATION:I c rt( that ft inform 'on ided here" is t ue and accurate to the best of my knowledge. <br /> APPLICANT SIGNATU A, DATE: ^_ 490-77. <br /> i 'W- y r <br /> REPRESEMMQ❑I.Tank Owner/O LFocilily Owner/ or Ol.AmharizedR raenmiire ofUwn 490-K <br /> APPLICANT NAME(print): 49 78. APPLICANT TITLE: 490179. <br /> UPCF UST-D(1212007)-3/4 www.unidoes.org <br />