My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
20
>
2300 - Underground Storage Tank Program
>
PR0231380
>
BILLING 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 1:25:23 PM
Creation date
11/6/2018 11:18:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231380
PE
2361
FACILITY_ID
FA0000645
FACILITY_NAME
SHORT STOP FOOD MART
STREET_NUMBER
20
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04134015
CURRENT_STATUS
01
SITE_LOCATION
20 W TURNER RD # A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\20\PR0231380\BILLING 2009 - 2015.PDF
QuestysFileName
BILLING 2009 - 2015
QuestysRecordDate
11/2/2016 10:15:51 PM
QuestysRecordID
3241972
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUNDSTORA�ETANK <br /> RESPONSE PLAN -- PAGE 1 one fpm <br /> SEP 17 2013 <br /> I TYPE OF ACTION 1,NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> 1. FACILITY INFORMATION <br /> FACILITY ID if (Agwmmcv Use On(y) — <br /> BC USINESS NAME(Sane es FACILITY NAME)_TA <br /> HUS ESS SITE CITY <br /> BUSINESS SITE ADDRESS �. b' i' i1 ys Z�.O <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized mleeacs from UST systems and supplements the emergency response plana and Procedures In the facility Hazardous Materials <br /> Business Plan("MBP). f <br /> Y If safe to do so,facility pastrami will take immediate measures to control or atop any release(e.g.,activate pump shut-oD;Iter.)and.if necessary',safely remove <br /> remaining hazardous ma trial from the UST syaem, <br /> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> se <br /> contain the hazardous material,but not greater than 30 calendar dayii,or sooner if requited by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as haramdous waste. <br /> i Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 Mds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a property labeled andY�I u cam-onla�ner. Waste material gas"be disposed of <br /> appropriately. <br /> > Facility personnel will determine whether any water removed from secondary containment systems,or Prom clean-up,activity,has been in contact with any <br /> hazardous mgeriaL If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination i^accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(ix.,rainbow colors),it is contaminated. A thick tloaing petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)Rom sumps,spill containers,acwill not be disposed w storm water systems. <br /> Y we will review secondary containment systems for possible deterioration if my of the following conditions occur: <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment: <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment <br /> 3. Hazardous material, other than the product/wasle gored in the primary containment system,is placed inside secondary containment to neat Or neutralize <br /> released productlwastc,and the added material or resulting material from such a combination isnot compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is Iduran in the Facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and alta each use,supplies arc replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> 1. EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: (Com ase adv 'p irob(e <br /> Er—OI-�PM�rENNT LOCATION R±0. AVAILABILITY <br /> Nd. <br /> 0.I' ^'•±. W2 <br /> aO. RJ. 0.75. <br /> —� dlaNi <br /> RIS. RDs. R15. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON($)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY U NVER THIS RESPONSE PLAN: wa <br /> NAME .. . /L,e ` R40. TITLE Vc..r-+f � r A/ �1 Y12 <br /> R51 <br /> R <br /> NAME TITLE <br /> 152, <br /> NAME Ra.. TITLE <br /> NAME Ras. TITLE <br /> V. MONITORING INDICATORS <br /> ORIEDELEASE,STEPS ERIEELEEWLLBMADES FOLLOWS <br /> IFMONITORINGINDICATESAPOSSIBLEUNAUT : Rha <br /> Q I. ADDITIONAL SYSTEM TESTINO OR DATA COLLECTION ❑2. INSPECTION BY QUALIFIED PERSONS E13. RECALIBRATION OF EQUIPMENT <br /> Rel. <br /> ❑5q. U'rHER(apwityY <br /> r <br /> UN-0328-1f3 www.Rddew.org Rev.O"IM <br />
The URL can be used to link to this page
Your browser does not support the video tag.