Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE 1 one t ^n er to i'i'i] <br /> Ra. <br /> f TYPE OF ACTION I.NEW PLAN ❑ '- CHANGE OF INFORMATION <br /> r— 1. FACILITY INFORMATION <br /> FACILITY ID It llge0n Use Onh') <br /> BUSINESS NAME(Sanleas FACILITYNAME) <br /> SINESS SITECITY <br /> IL� BU <br /> BUSINFSS SITE ADDRESS ,` <br /> IL SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases liom UST systems aria ssuppinnenls the emergency responx plans and pracMurcs in the facilitys Nar�rdous Matmals <br /> Business Plan(HMBP). shut.ofr,etc)and,if necessary,safely remove <br /> It safe to do v>,facility personnel%%,)I take Immediate measure$to control or slop any release(e.g.aclivate pump <br /> remaining hazardous material from the UST system. <br /> Any release to secondary containment will be pumped or miterwise removed within a time continental a with the ability of the secondary containment system to <br /> s,or sooner if req <br /> contain the hazardous material,but net greater than 30 calendar dayuired by the local agency. Recovered hazardous Irlalerials,unless still sortable <br /> for their Intended use,will be managed as hazardous waste. <br /> be <br /> ir Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent materia( which has become too 2.11 fins at <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination m accordance with?2 CCR§hall be <br /> Bride Thal <br /> a is non-hszard^us. Used absorbent material,reusable or waste, will be stored in a properly labeled and;y� p neS. Waste materia!shall be disposed of <br /> ' appropriately. <br /> Facility personnel will determine whether any water removed from secondary conternmenl systems, ar from clean-up activity, has accbeeordance <br /> is comae ion any <br /> hazardous material. If the water is contaminated, rt will be martageu as hazardous waste on a hazardous waste detenncmion m accordance with ?2 CCR <br /> :66262.11 Finds that it Is non-hazardous. It the water has a petroleum sheen(i.e.,rainbow colors},it!s contaminatetl. A thick Roaring petroleum layer may not <br /> necessarily display rainbow colors. `Nater(hezardous or non-hazardous)from sumps,spill containers,rtewill not be disposed to stunn water systems_ <br /> 1 We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> { I. Hazardous material in contact with secondary containment 1,not compatible with the material used for secondary containment; <br /> 2. Secondarycontainmentis Drone to damage from any equipnsent used to remove or clean up Iwirdous material collected in secondary comammttri <br /> 3. Hazardous material, other than the produrdivule stored In the primary conlamment system, is placed inside secondary containment to treat or neutralize <br /> released producuwaste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> Ell. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept Permane^sly on-sle n luted m the lacility s Hed d replaced <br /> Materals Business PW. This <br /> i <br /> equipment is Inspected at least MI ty,and slier each use,supplies are replenished as needed. Defeclive equipment is repairor replaced as Iwcesaary. <br /> E UIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: 'Cart ate 001 1 u led e) <br /> EQUIPMENT LOCATION A LABILITY <br /> It. gy C C� C RI•. <br /> R13. <br /> R3a. <br /> R14. <br /> R2a. <br /> RIS. R]S. RIS. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOW NG PERSON )IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY U ER S RESPONSE PLAN: <br /> NAME Rae. TITLE <br /> NAVE al. TITLE G`X'✓ A RSI. <br /> Rs, <br /> NAME � Ra'-� TITLE ..�• <br /> NAME Ra). TITLE Rsi <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑t. ADDITIONAL.SYSTEM TESTING OR DATA COLLECTION ❑2. INSPECTION BY QUALIFIED PERSONS C33, RECALIBRATION OF EQUIPMENT Rha. <br /> ❑v0. OTHER(SPs.ry!' rw'_ <br /> UN-0226-113 www.unidocs.org Rev.0410VU <br />