Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE 1 One fora per facait ) <br /> R01. <br /> TYPE OF ACTION 911.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID k (Agency Use Only) I' <br /> BUSINESS NAMEh(S[am�e as�TY NAME) <br /> BUSINESS SITE ADDRESS / 103 1 BUSINESS SITE CITY S L Q00 <br /> o �,4 W /u $i' Csy. 9 <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> to If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become loo saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick Boating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2 Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE BUT AVAILABLE FOR USE IF NEEDED: (Complete onl i a licable <br /> EQ PMENT LOCAT AV LABILITY <br /> $ O►�'r�M R o. 4f S /117 4Z <br /> A R11. R21. `l I/ R31. <br /> RI2. R22. 02. <br /> R13. R23. R33. <br /> RIO. R4, RN. <br /> R15. R_'S. R35, <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWItG PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY VqDER THIS RESPONSE PLAN: <br /> NAME G/` Rao. TITLE ! RSo. <br /> NAME Rat. TI TL l �r R51. <br /> NAME R42. TITLE 1152. <br /> NAME R43 TITLE 1?53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED SE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> 01. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION 91 INSPECTION BY QUALIFIED PERSONS 03. RECALIBRATION OF EQUIPMENT R60. <br /> ❑99. OTHER(Specify): R61. <br /> UN-022B-1/3 www.unhlaes.org Rev.00/02/08 <br />