My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
20
>
2300 - Underground Storage Tank Program
>
PR0231380
>
BILLING 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 1:25:23 PM
Creation date
11/6/2018 11:18:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231380
PE
2361
FACILITY_ID
FA0000645
FACILITY_NAME
SHORT STOP FOOD MART
STREET_NUMBER
20
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04134015
CURRENT_STATUS
01
SITE_LOCATION
20 W TURNER RD # A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\20\PR0231380\BILLING 2009 - 2015.PDF
QuestysFileName
BILLING 2009 - 2015
QuestysRecordDate
11/2/2016 10:15:51 PM
QuestysRecordID
3241972
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 (One form per facility) <br /> TYPE OF ACTION I.NEW PLAN ❑ 2.CHANGE OF INFORMATION xoh. <br /> L FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) Roz. <br /> ypn t S)vP ;rvv4 AMA <br /> HusBasss SITE D D WTv A 1 � 120A,9101 �L- Ro3. Gr �D Ro. <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-(hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> AZA/IDOUC uC/GET R1o. 'p✓gCK -51ZWA6C— Reo <br /> . f}L�A'JS f1vrR/UFBc� Ria. <br /> s d r &rro /�4_ o�Gi �� R21. R31. <br /> R12 R22. M2. <br /> R13. M. M3. <br /> R14. R24. M4. <br /> R15. R25. RIS. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> c9 <br /> NAME -PO^ee;-_1 fiS G." xm, TITLE CIOAJ45�7 <br /> NAME /', r"f R41 TITLE m1. <br /> NAME x42. TITLE 1t5z <br /> NAME x43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL HE�Q�SEQL OWS: <br /> ❑Additional system testing or data collection spection by qualified persons ❑Recalibration of equipment O C(� I��� <br /> Other: R EC <br /> 19 '1014 <br /> ENVIRONMENTAL <br /> UST Response Plan(32008)-1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.