Laserfiche WebLink
NNIFIED PROGRAM CONSOLIDATED FORM - <br /> UNDERGROUNDSTORAGETANK <br /> \i MONITORING PLAN (Page 2 of 2) `a/ <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.54e <br /> 490.546 <br /> ❑ L CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> C9 4.NO DISPENSERS ❑99.OTHER(S eci ): <br /> PANEL MANUFACTURER: 490.55 MODEL p: 490-56. <br /> LEAK SENSOR MANUFACTURER: 490.57 MODEL#(S): 49a58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ &YES ❑b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490'60- <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ &YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS ❑L SINGLE-WALLED ❑2.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: 49a64 <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ 1.LIQUID_❑�.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490.646 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 4966 <br /> —____________________________.____—__—__---_____________________________—_____________— <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> VIII.RECORDICEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 49 68a ❑Visual Inspection Records 490.686 El Tank integrity testing results 490-6ac <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 49068e <br /> ®ATG Testing results(and supporting documentation records).490.68f ❑ Corrosion Protection 60-day logs 490fi8g <br /> ®Equipment maintenance and calibration records. 49a68h <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 490-690- <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49 % <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490 69c <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK LAW 49o-s% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.69, <br /> ❑ <br /> OTHER(Specify):M69i M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will Vain facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate haw many pages with additional information on specific monitoring procedures are attached to <br /> this plan.490-71 <br /> t)v f-even+ ,Oso Q UaI) a'- V ( q�../r4 SC Cts` <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Gary Duvall 490-75 TITLE Desginated Operator <br /> 490-73 <br /> NAME 49x74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 49077 <br /> h 'zedac¢sentati�€ <br /> APPLICANT NAME(print): 49x78 APPLICANT TITLE: 490x79 <br /> Todd Harris Regional Env. Manager <br /> UPCF UST-D(122007)3/4 <br />