Soil Remediation Workplan - Page 2 <br /> 7. Soil to be aerated on site <br /> B. Work to commence as soon as possible after January 1 , 1989. <br /> Excavation should only take a few hours. Soil sample <br /> results should be available within two weeks of excavation. <br />