My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VANDERBILT
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231745
>
COMPLIANCE INFO PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 4:10:28 PM
Creation date
11/6/2018 11:45:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0231745
PE
2381
FACILITY_ID
FA0003617
FACILITY_NAME
CAL WEST CONCRETE CUTTINGS INC
STREET_NUMBER
1153
STREET_NAME
VANDERBILT
STREET_TYPE
CIR
City
MANTECA
Zip
95337
APN
22119031
CURRENT_STATUS
02
SITE_LOCATION
1153 VANDERBILT CIR
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VANDERBILT\1153\PR0231745\COMPLIANCE INFO PRE 2016 .PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/13/2016 3:35:34 PM
QuestysRecordID
3190546
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATA CHART FOR TANK SYSTEM TIGHTNESS TEST <br /> (EZY CHEK) <br /> TENT p <br /> SME OF SUPPLIER, <br /> VNER OR DEALER 64 L � DATE OF TEST <br />(DRESS (NO. &STREET) 1(,S"A va.,nta CL r. WEATHER C6 G1f)2 TEMPERATURE <br /> FY AND STATE <br /> NK INFORMATION A <br /> rdrt <br />,PACITY(NOMINAL) GALS. SIZE OF FILL OR TEST OPENING IN. CONTENTS(PRODUCT) <br />,PACITY(CHART) GALS. TOP OFF TIME 31ps 9•a5-9N GALLONS 1i'COO TANK MATERIAL Sf4T't- <br /> NENTNS: DIAMETER 4/1 NUM9ER OF GALLONS ADDED TO START TEST ,g APPROX. AGE <br /> LENGTH TANK NO. 4'�:: 91 PUMP SYSTEM (TYPE) S4cfYa� <br /> INCHES OF WATER — BEFORE TEST AFTER TEST <br />'.ST CALIBRATION TANK LAYOUT <br />?E OF CAL. BAR OR ML'S ADDED <br /> (ALM) , (FAC TOR A) <br /> JE MOVEMENT <br /> I to LINES <br /> z 6r to q 3 = �— LINES ✓adv <br /> 3 (a tl to R� _ .94 LINES '�"V� F"[C <br /> TOTAL r4 9 LINES + 3 = a"® LINES 1"FU111 <br /> (ALM) y'T <br /> ID OF TEST CALIBRATION <br /> ZE OF CAL. BAR OR ML'S ADDED •0c; — ��FI •tel <br /> (ALM) (FACTOR AI <br /> NE MOVEMENT <br /> t SS to la3 = LINES <br /> Z S'4 to LINES <br /> 3 S3 to LINES <br /> TOTAL Ifu LINES - 3 LINES <br /> \\\ IALMI <br /> EASURED API SPECIFIC GRAVITY 34 <br /> IODUCT TEMPERATURE 3� <br /> 31 SPECIFIC GRAVITY 2 60° F (FROM TABLE A) <br />:)EFFICIENT OF EXPANSION (FROM TABLE B) <br /> -C6W41 6fgO x _/BrD�XI = 14 4(6'0 (FACTOR B) <br /> GO E. TOTAL CAPACITY(GAL) VOLV L CHANGE/'F <br /> PRODUCT LINE TESTING SYSTEM <br /> PRODUCT MONITORING ON LL Product Serial Number, <br /> Time Reading +Gain +Gain <br /> IMaitary) No. SIdR End -Lass I ,Y Factor A -Lose <br /> .00 <br /> .00 <br /> .00 <br /> DD <br /> TECHNICIA ) f DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.