Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORINGPLAN (Page2ot2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490 <br /> 490546ZO <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 112.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> 19 4 NO DISPENSERS 1199,OTHER(Specify): _ <br /> PANEL MANUFACTURER: 490'ss MODEL#: 4voss. <br /> LEAK SENSOR MANUFACTURER: 79075i- MODEL#(S): 49a59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ s.YES ❑b.NO 490.99 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 49061k <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 49061 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a.YES ❑b.NO 49062 <br /> 2.UIIC CONSTRUCTION LS 111.SINGLE-WALLED 112.DOUBLILWALLED 4906r <br /> IF DOUBLE WALLED: 4906°' <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQUID ❑2.PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑c YES ❑b.NO 4909 b <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 4s <br /> MUST BE PERFORMED. PERIODIC ELD IS <br /> PERFORMBD EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.x___ <br /> 9 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br /> -- f <br /> ®3.SPILL BUCKETS ARE TESTEDANNUALLY. 49069 ! <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are keptfor this facility: <br /> ®Alarm logs 490489 N Visual Inspection Records 490-69b ❑Tank integrity testing results 490as9 <br /> ❑SIR testing results(and supporting documentation records). 49668d ❑ Tank gauging results(and supporting documentation records). 4909 <br /> ❑ATG Tesfing results(and supporting documentation records).4s0aar ❑ Corrosion Pramcdon 60-day logs 49°.6x8 <br /> ❑Equipment maintenance and calibration records. 49oaah j <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant t0 theirjob duties. 49°x9, <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-6% <br /> N OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)4soasc <br /> N CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS Oma% <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK LAW 490x9. <br /> ® STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"Oso of <br /> N SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490699 <br /> ❑ OTHER(Specify):M69K W% <br /> This facilityhas a"Designated UST Opemlot"who has passed the California UST System Operator Earn administered by the International Cade Council(ICC). <br /> The`Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems mums dly,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a miner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names ofconact personas)for emergencies and monitoring alarms.49 lir <br /> X. COMMENTS/ADDITIONAL INFORMATION - <br /> Provide additional comments hero or indicate how many pages with additional information on specific monitoring proceduros are attached to this plan.49 v - <br /> OVERFILL KK4;"ON -t- E IfAN(CA L FL�PME AT C15°/0 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Opemar is responsible for ensuring that 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The followin person(s)am responsible forperforming the monitoring and equipment mailitenan0c <br /> NAME'T c 1r d% 49arz TITLE r7E123/I p, -VAC }t c I N Oto-rr <br /> NAME 490-74 TITLE K0Ca1QWAL C. +- 490-7 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and atom,the owner/operator of any <br /> conditions that need follow-up action. <br /> XIL OWNER/OPERATOR SIGNATURE <br /> CERTDTLCATION:I certify that the information provided herein is true and accrrate to the but of my knowled m <br /> APPLICANT <br /> SIG <br /> N/�/ URB�j/ /� 490-)6 DATE: 490-77 <br /> APPLICANT NAME(print): 49099 APPLICANTTTTLE: 490-,9 <br /> GOR-414 SLt,9�Ez S�G�7Y GsAp�12 <br /> UPCF UST-D(122007)3/4 ' <br />